ESIE07-05
Functional Control
Part 2 – Functional Description
2–53
3
2
4
5
1
Other settings
■
Start up
∆
T : 2.7°C
■
Shutdown
∆
T : 1.7°C
■
Regulation band : 3°C
EXAMPLE: Upload
1)
■
If the water temperature is above 9.7°C the chiller can start (below 9.7°C the chiller will wait)
■
Unit will start leader compressor
2)
■
Unit will load leader compressor till 75%
3)
■
If temperature is in Regulation Band
Æ
wait interstage time (default 210 sec)
■
If temperature is approaching setpoint (after interstage time)
Æ
wait (no need to start new compressors because chilled water temperature is decreasing,
prevent undershoot)
■
After interstage time check if temperature is in unloading band
4a)
No: Unit will add next compressor (25% capacity) and keep the leader compressor at 75%
Leader comp : 75%
Next comp : 25%
4b)
Yes: Unit will first unload leader compressor to 50%, when this is done the next compressor
will start (25%)
Leader comp : 50%
Next comp : 25%
This will give you again 75% capacity but now the unit is able to upload in small steps.
■
Unit will upload the running compressors to 75%
■
If another compressor is present and there is still demand for load, the regulation cycle will
continue from point 3.
■
If no other compressors are present and there is still demand for load, the compressors will
upload to 100% capacity according to the PID regulation (if needed).
■
When the temperature is in the dead band, the unit will operate with the same capacity (no upload
or download)
ESIE07-05.book Page 53 Friday, December 21, 2007 3:21 PM
Содержание EWWQ-AJYNN
Страница 3: ...ESIE07 05 book Page 2 Friday December 21 2007 3 21 PM...
Страница 13: ...ESIE07 05 2 2 Part 2 Functional Description 3 1 2 5 ESIE07 05 book Page 2 Friday December 21 2007 3 21 PM...
Страница 88: ...ESIE07 05 3 2 Part 3 Troubleshooting 3 1 3 5 ESIE07 05 book Page 2 Friday December 21 2007 3 21 PM...
Страница 112: ...ESIE07 05 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ESIE07 05 book Page 2 Friday December 21 2007 3 21 PM...
Страница 114: ...ESIE07 05 5 2 Part 5 Maintenance 3 1 5 ESIE07 05 book Page 2 Friday December 21 2007 3 21 PM...