7
|
Unit installation
Installer reference guide
66
EPRA14~W1 + ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679467-1 – 2022.02
7 Unit installation
In this chapter
7.1 Preparing the installation site
Choose an installation location with sufficient space for carrying the unit in and out
of the site.
Do NOT install the unit in places often used as work place. In case of construction
works (e.g. grinding works) where a lot of dust is created, the unit MUST be
covered.
WARNING
The appliance shall be stored in a room without continuously operating ignition
sources (example: open flames, an operating gas appliance or an operating electric
heater).
7.1.1 Installation site requirements of the outdoor unit
INFORMATION
Also read the precautions and requirements in the
10].
Mind the spacing guidelines. See
"16.1 Service space: Outdoor unit"
NOTICE
▪
Do NOT stack the units on each other.
▪
Do NOT hang the unit on a ceiling.
Содержание ETSHB16P30EF
Страница 304: ...16 16...
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ...4P679467 1 2022 02 Copyright 2022 Daikin 4P679467 1 0000000 Verantwortung f r Energie und Umwelt...