7
|
Unit installation
Installer reference guide
77
EPRA14~W1 + ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679467-1 – 2022.02
NOTICE
Level.
Make sure the unit is level. Recommended:
Use 4 sets of M12 anchor bolts, nuts and washers. Provide at least 150 mm of free
space below the unit. Additionally, make sure the unit is positioned at least
100 mm above the maximum expected level of snow.
Anchor points
800
(mm)
479
Pedestal
When installing on a pedestal, make sure that the discharge grille still can be put in
its safety position. See
"7.3.7 To remove the discharge grille, and put the grille in
81].
800
479
a
≥150
(mm)
4× M12
a
Make sure not to cover the drain hole in the bottom plate of the unit.
7.3.4 To install the outdoor unit
1
Carry the unit by its slings, and put it onto the installation structure.
Содержание ETSHB16P30EF
Страница 304: ...16 16...
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ...4P679467 1 2022 02 Copyright 2022 Daikin 4P679467 1 0000000 Verantwortung f r Energie und Umwelt...