4
|
Components
Service manual
53
RXJ20~50A + FTXJ-A(W)(S)(B)
Split Emura 3 R32
ESIE22-04 – 2022.04
a
b
a
Cable tie
b
Switch box
7
Install the insulation on the upper side of the switch box.
a
b
a
Insulation
b
Main PCB
4.1.2 Indoor unit
To open the front panel
1
Stop operation by
.
Result:
The front panel closes automatically.
2
Open the front panel using the wireless remote control.
Result:
The front panel opens.
3
Turn the power supply OFF.
4
Pull down both locks on the back of the front panel.
5
Open the front panel until the support fits into the fixing tab.
draft – 22/04/2022 08:50
Содержание Emura 3 Series
Страница 98: ......
Страница 99: ......
Страница 100: ...draft 22 04 2022 08 50 ESIE22 04 2022 04 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...