13
|
About the box
Installer and user reference guide
49
EKVDX32~100A2VEB
VRV system air conditioner
4P664010-1 – 2021.08
13 About the box
In this chapter
13.1 Overview: About the box
This chapter describes what you have to do after the box with the indoor unit is
delivered on-site.
Keep the following in mind:
▪
At delivery, the unit MUST be checked for damage. Any damage MUST be
reported immediately to the claims agent of the carrier.
▪
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
▪
Prepare the path along which you want to bring the unit inside in advance.
13.2 Indoor unit
13.2.1 To unpack and handle the unit
1
2
Содержание EKVDX-A
Страница 95: ......
Страница 96: ...4P664010 1 2021 08 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...