background image

Installation manual

35

E(D/B)(H/L)Q011~016BB

Unit for air to water heat pump system

4PW67904-1 – 01.2011

[4-03]=4, then booster heater operation is the same as
setting 2, except that the domestic water heating (heat pump
and booster) will operate according to the scheduled storage
and reheat function. See field settings 

"[6-03]" on page 37

and 

"[6-05]" on page 37

.

Backup heater operation (only for EKHTS)

The operation of the backup heater can altogether be enabled,
disabled, or limited.

[4-00] Status: defines whether backup heater operation is
disabled (0), enabled (1) or limited (2).
When [4-00]=2, the backup heater is only allowed during
domestic water heating mode.

Space heating off temperature

[4-02] Space heating off temperature: outdoor temperature
above which space heating is turned off to avoid overheating.

[4-06] Backup heater emergency operation: defines whether
backup heater is allowed (1) or not allowed (0) during
emergency operation.
Emergency operation will startup backup heater operation
during certain unit malfunctions.

[4-07] Backup heater second step: defines whether backup
heater second step is allowed (1) or not allowed (0).
In this way it is possible to limit the backup heater capacity.

Freeze protection function

[4-04] Freeze protection function. This function avoids
freezing of the (outside) water piping between the house and
the unit. In case of low ambient temperatures, it will activate
the pump/backup heater. The default freeze protection
function takes into account freezing of insufficiently insulated
water piping. Basically it means that the pump is activated
whenever ambient temperatures become close to freezing,
independently of the working temperature.

INFORMATION

When setting [4-03]=1/2/3/4, the booster heater
operation can still be restricted by the schedule
timer as well. I.e., when booster heater operation
is preferred during certain period of the day. (See
operation manual)

When setting [4-03]=2, the booster heater will be
allowed to operate when T

A

<[5-03] independent

of the status of [5-02]. If bivalent operation is
enabled and permission signal for auxiliary boiler
is ON, the booster heater will be restricted even
when T

A

<[5-03]. (See 

"[C-02]" on page 41

).

Booster heater is always allowed during powerful
and disinfection function, except for the period
that the backup heater operation is required for
safety reasons and [4-02]=1.

CAUTION

For optional domestic hot water tank, the field
setting [4-03] shall be 0, 1, 2, 3, or 4.

In case [4-03]=5, there is an incorrect field wiring
between tank and unit. The required corrective
action is described in 

"Symptom 8: [4-03]  and

maximum tank set point is not according to the the
applicable tank" on page 52

.

INFORMATION

[4-03]=3 (default), this setting is automatically
selected if the correct and complete wiring
connections between unit and switch box

(a)

 of the

optional domestic hot water tank are done
BEFORE SS2-2 is set to ON. [4-03]=0~4 activate
the applicable logic and field settings for EKHW*.

(a) Only applicable for tank with built-in electrical booster heater 

(EKHW*).

INFORMATION

For tank without electrical booster heater (EKHTS), the
backup heater will be used in domestic water heating
mode.

INFORMATION

In special conditions, for example the unit
cannot work due to malfunction, the backup
heater will also be allowed to operate during
space heating.

If the backup heater operation is disabled
([4-00]=0), the domestic water will not be
heated.

CAUTION

For optional domestic hot water tank EKHTS, the
field setting [4-03] shall be 5.

[4-03]=5, this setting is automatically selected if the
EKHTS tank is connected and SS2-2 is set to ON.
[4-03]=5 activate the applicable logic and field
settings for EKHTS.

INFORMATION

Make sure that the domestic hot water set point is
according to your requirements.

Start with a low domestic hot water set point, and only
increase if you feel that the domestic hot water supply
temperature is not sufficient for your requirements
(this depends on your water using pattern).

Make sure the domestic water is not heated
unnecessary.

INFORMATION

Only for EKHTS: If the storage temperature set point
is higher than 50°C, Daikin advises not to disable the
backup heater second step because it will have a big
impact on the required time for the unit to heat up the
domestic hot water tank.

Содержание EDHQ011BB6V3

Страница 1: ...EDHQ016BB6W1 EDLQ011BB6V3 EDLQ014BB6V3 EDLQ016BB6V3 EDLQ011BB6W1 EDLQ014BB6W1 EDLQ016BB6W1 EBHQ011BB6V3 EBHQ014BB6V3 EBHQ016BB6V3 EBHQ011BB6W1 EBHQ014BB6W1 EBHQ016BB6W1 EBLQ011BB6V3 EBLQ014BB6V3 EBLQ0...

Страница 2: ...2 1 W1 V3 DC AC DC AC AC AC A A B1 B1 B1 B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 1 1 2 A A B2 B2 B2 D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 B1 B1 B1 C C 1 2...

Страница 3: ...gelse af bestemmelserne i 11 enligt villkoren i 12 gitt i henhold til bestemmelsene i 13 noudattaen m r yksi 14 za dodr en ustanoven p edpisu 15 prema odredbama 16 k veti a z 17 zgodnie z postanowieni...

Страница 4: ...lines 24 9 5 Precautions on wiring of power supply 24 Specifications of standard wiring components 24 Connection of the backup heater power supply 24 Connection of the thermostat cable 25 Connection o...

Страница 5: ...eration of the unit always contact your local dealer for advice and information Improper installation or attachment of equipment or accessories could result in electric shock short circuit leaks fire...

Страница 6: ...trical booster heater EKHW in 3 different sizes 150 200 and 300 litre tank without electrical booster heater EKHTS in 2 different sizes 200 and 260 litre Refer to the domestic hot water tank installat...

Страница 7: ...e the selection is done and the water system is designed this manual describes the procedures for handling installing and connecting the EDH EBH EDL and EBL units This manual has been prepared to ensu...

Страница 8: ...s on pump configuration can be found under 10 3 Pump operation configuration on page 29 NOTICE When circulation in each floor heating loop FHL1 3 is controlled by remotely controlled valves M1 3 it is...

Страница 9: ...ugh floor heating loops and fan coil units Cooling is provided through the fan coil units only 1 Unit 2 Heat exchanger 3 Backup heater 4 Pump 5 Shut off valve 6 Collector field supply 7 By pass valve...

Страница 10: ...12 Aquastat valve field supply 13 Shut off valve field supply 14 Non return valve field supply FHL1 3 Floor heating loop field supply UI User interface Field wiring configuration A BTI Boiler thermost...

Страница 11: ...as to achieve the target leaving water temperature as set on the user interface When weather dependent operation is active the water temperature is determined automatically depending on the outdoor t...

Страница 12: ...s that the heat pump will can operate at the lowest required leaving water temperature when only floor heating is required Higher leaving water temperatures are only required in case fan coil units ar...

Страница 13: ...t 4 Heat exchanger 5 Expansion vessel 10 l 6 Refrigerant liquid connection 7 Refrigerant gas connection 8 Shut off valves The shut off valves on the water inlet connection and water outlet connection...

Страница 14: ...h box main components door 2 1 Backup heater contactors K1M and K5M 2 Main PCB The main PCB Printed Circuit Board controls the functioning of the unit 3 Booster heater contactor K3M only for installat...

Страница 15: ...mals making contact with electrical parts can cause malfunctions smoke or fire Please instruct the customer to keep the area around the unit clean and clear Carry out the specified installation work i...

Страница 16: ...ion of the wind 3 Prepare a water drainage channel around the foundation to drain waste water from around the unit 4 If the water drainage of the unit is not easy please build up the unit on a foundat...

Страница 17: ...ge 16 Precaution A In case of non stacked installation figure 1 INFORMATION Spare thermistor fixing plate is delivered in the accessory bag 2 1 3 4 5 6 8 7 9 10 Suction side obstacle Obstacle is prese...

Страница 18: ...slings These slings can be fitted into specially for this purpose foreseen sleeves at the base frame Opening closing the unit Be sure to confirm the model name and the serial no of the outer front pla...

Страница 19: ...tional and insulate the pipe to prevent condensation Make sure the drain works properly Installation method for prevention of falling over If it is necessary to prevent the unit from falling over inst...

Страница 20: ...ss metallic piping make sure to insulate both materials from each other to prevent galvanic corrosion Because brass is a soft material use appropriate tooling for connecting the water circuit Inapprop...

Страница 21: ...ll lead to malfunction of the system Therefore the pre pressure should only be adjusted by an installer Connecting the water circuit Water connections must be made in accordance with the applicable le...

Страница 22: ...applicable legislation In case of over pressure when using glycol be sure to connect the safety valve to a drain pan in order to recover the glycol For this purpose a knock out hole is foreseen in the...

Страница 23: ...very likely to happen and damaging the system in the process A A WARNING Electrical installation All field wiring and components must be installed by an installer and must comply with the applicable l...

Страница 24: ...n PS Switching power supply Q1DI Earth leakage circuit breaker R1 R2 Resistor only for V3 models R1 R4 Resistor only for W1 models R1T Thermistor air R2T Thermistor discharge R3T Thermistor suction R4...

Страница 25: ...WIRING DIAGRAM ONLY APPLIES TO THE HYDROMODULE SWITCH BOX 2 USE A DEDICATED POWER CIRCUIT FOR THE BACKUP HEATER AND BOOSTER HEATER NEVER USE A POWER CIRCUIT SHARED BY OTHER APPLIANCE 3 FIELD WIRING NO...

Страница 26: ...ooster heater EKHW T M M B 1 2 6 4 12 5 7 8 9 C D F I J H G UI E 3 A K 10 11 Item Description AC DC Required number of conductors Maximum running current 1 Power supply cable for unit AC 2 GND a a Ref...

Страница 27: ...te connections and fix the wires so that outside forces are not applied to the terminals Specifications of standard wiring components Door 1 compressor compartment and electrical parts X1M 1 Earth lea...

Страница 28: ...shall be a voltage free contact that ensure 230 V 100 mA Procedure 1 Connect the contact of first set point and second set point to the appropriate terminals as shown in the figure below 2 Fix the ca...

Страница 29: ...3 way valve The 3 way valve should be fitted as such that when the 3 way valve is idle not activated the space heating circuit is selected SPST 3 wire type 3 way valve The 3 way valve should be fitted...

Страница 30: ...2 1 N L X11M 1 2 1 2 3 4 4 3 2 1 4 3 2 1 2 1 N L X11M 4 3 2 1 2 1 N L X11M BLK WHT BLK WHT 4 3 2 1 17 18 1 2 X40A A1P L N 2 4 1 3 3 L N 2 1 4 3 4 3 L N 2 1 S2S S2S S2S d 01 1 L N 2 1 3 L N 2 1 4 3 4 4...

Страница 31: ...75 1 25 mm2 Maximum length 500 m NOTICE The wiring for connection is not included NOTICE The digital controller delivered in a kit has to be mounted indoors NOTICE Be careful not to distort the shape...

Страница 32: ...e lifetime of the pump INFORMATION When a room thermostat is connected to the unit the heating and cooling schedule timers are never available Other schedule timers are not affected For more informati...

Страница 33: ...B 1 Do not forget to turn on the booster heater circuit breaker F2B in the switch box applies only to units with optional domestic hot water tank 6 Earth wiring Make sure that the earth wires have bee...

Страница 34: ...or air outlet are blocked If the error code U2 is displayed on the remote controller check for voltage imbalance If the error code L4 is displayed on the remote controller it is possible that air inl...

Страница 35: ...ication on the user interface is given When level 2 3 is selected the actual permission level either level 2 or level 3 is determined by the field setting 0 00 1 Weather dependent set point The weathe...

Страница 36: ...h the domestic hot water should be heated 2 01 Status defines whether the disinfection function is turned on 1 or off 0 2 02 Start time time of the day at which the domestic hot water should be heated...

Страница 37: ...operation is only allowed if heat pump is out of operation range of heat pump domestic water heating mode TA 5 03 or TA 35 C or domestic hot water temperature is 2 C lower then the heat pump OFF tempe...

Страница 38: ...n is enabled and permission signal for auxiliary boiler is ON the booster heater will be restricted even when TA 5 03 See C 02 on page 41 Booster heater is always allowed during powerful and disinfect...

Страница 39: ...and can not be modified 5 01 Equilibrium temperature outdoor temperature below which operation of the backup heater is allowed Space heating priority temperature only for EKHTS Applies only to instal...

Страница 40: ...Example 1 Scheduled storage 6 03 1 scheduled reheat 6 05 1 disinfection function 2 01 1 activated A Scheduled storage operation activated at 6 04 heat up domestic hot water untill domestic hot water u...

Страница 41: ...e domestic hot water set point is according to your requirements Start with a low domestic hot water storage set point and only increase if you feel that the domestic hot water supply temperature is n...

Страница 42: ...t set point can be a fixed value or weather dependent The second set point heating 7 03 should be linked to the heat emitters which require the highest set point in heating mode Example fan coil units...

Страница 43: ...pplicable in heating mode INFORMATION When heat pump is active in domestic water heating mode the delay time of booster heater is 8 03 When heat pump is not active in domestic water heating mode the d...

Страница 44: ...ting operation parallel connected The purpose of this function is to determine based on the outdoor temperature which heating source can will provide the space heating either the Daikin unit or an aux...

Страница 45: ...unit is not single phase W1 the combination of setting 4 03 0 2 with bivalent operation at low outdoor temperature can result in domestic hot water shortage The bivalent operation function has no impa...

Страница 46: ...disabled 0 Space cooling permission F 01 Space cooling permission temperature defines the outdoor temperature below which space cooling is turned off Bottom plate heater control Applies only to insta...

Страница 47: ...3 5 60 fixed 5 C 03 Set point only in combination with domestic hot water tank with built in electrical booster heater EKHW 4 03 5 70 55 80 5 C 04 Interval only in combination with domestic hot water...

Страница 48: ...ed time storage start time 1 00 0 00 23 00 1 00 hour 05 Scheduled time reheat or continuous reheat 0 OFF 0 1 2 1 06 Scheduled time reheat start time 15 00 0 00 23 00 1 00 hour 07 Domestic hot water re...

Страница 49: ...pplicable Do not change the default value 0 Read only C Setup on EKRP1HB digital I O PCB 00 Solar priority mode setting 0 0 1 1 01 Alarm output logic 0 0 1 1 02 X1 X2 function Bivalent operation statu...

Страница 50: ...on number selection 1 1 20 1 06 Heating set point of selected action number F 05 25 0 c 15 55 1 C 07 Time of selected action number F 05 0 c 0 72 12 hour 08 Underfloor heating screed dry out program e...

Страница 51: ...st the cooling operation push the h c button so the c icon is displayed To start the test run operation press the y button To test the domestic water heating operation push the v button The test run o...

Страница 52: ...xample 25 C Save the new value by pressing the pr button 3 Set in F 07 Time of selected action number F 05 example 24 hours Save the new value by pressing the pr button 4 Repeat step 1 through 3 to pr...

Страница 53: ...program enabled 1 disabled 0 is always set to 0 disable when a program has been started once This means that in case a second time an underfloor heating screed dry out program must be started then F 0...

Страница 54: ...f NOTICE For problems related to the optional solar kit for domestic water heating refer to the troubleshooting in the installation manual of that kit POSSIBLE CAUSES CORRECTIVE ACTION The temperature...

Страница 55: ...ted Check that the backup heater operation status field setting 4 00 is turned on see 10 10 Field settings on page 32 Check whether or not the thermal protector of the backup heater has been activated...

Страница 56: ...is giving the correct read out A1 Hydraulic PCB defective Contact your local dealer A5 Too high during heating operation or too low during cooling operation refrigerant temperature measured by R13T C...

Страница 57: ...contain the latest action number executed F 08 Underfloor heating screed dry out program enabled 1 disabled 0 is always cleared to 0 disable This means that in case a second time a Underfloor heating...

Страница 58: ......

Страница 59: ......

Страница 60: ...4PW67904 1 01 2011 Copyright 2011 Daikin...

Отзывы: