![Daikin DCS601B51 Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/daikin/dcs601b51/dcs601b51_operation-manual_501822028.webp)
27
Operation
(Reference)
System Setup
Menu Item
Description
Menu for setting scheduled operation by zone or by group.
Scheduled operation is a function to automatically start or stop air conditioners at a
certain time (year, month, day, day of week, hour, minute) preset for the intelligent
Touch Controller in accordance with the operating status of air conditioners.
Schedule setting includes the following steps:
•
Each schedule can include four types of plans: for Weekday, Day off, Special 1 and
Special 2.
Allocate the four types above to Weekly Setup and Calendar Setup as described
below.
•
Weekly Setup: set general operation schedule.
(Ex.: setting for Day off for Saturdays and Sundays and setting for Weekday for
days other than Saturdays and Sundays)
•
Calendar Setup: set days that do not fall within the range of Weekly Setup above.
(Ex.: New Year’s holidays, etc.)
•
Make Patterns Setup for the four types of plans above: for Weekday, Day off,
Special 1 and Special 2.
(Ex.: Start operation for Zone 1 at 9:00 and stop at 17:00, etc.)
•
Up to 8 settings as described above can be made.
Specific Example
1. [Floor Usage]
1F: Reception: 1F is registered as the zone name.
2F: Office: 2F is registered as the zone name.
3F: Canteen: 3F is registered as the zone name.
Schedule
Setup
→
Setting can be made for up to 13 months in advance.
→
Each of the plans allows setting of up to 16 operations.
2.Make Weekly Setup in accordance with the usage
for one week of the zone above.
“
Day off
”
“Weekly Setup”
“Calendar Setup”
“Weekday”
“Special 1”
“Weekday”
3.Make Calendar Setup for special usage other
than the weekly usage of the zone above.
47
See page
47
“
Day off
”
“
Day off
”
“Special 2”
See page
Zone name
Day of week
Sunday
Monday
Working hours: 8:30 - 17:00
1F
Tuesday
Wednesday
Thursday
Friday
Saturday
Set Saturday and Sunday as
Day off and Tuesday to
Friday as Weekday.
Set the third Saturday of each month as Weekday and April 30 - May 5,
August 10 - August 15 and December 29 - January 4 as Day off,
December 28 as Special 1 and January 5 as Special 2.
Apr. 30 -
May 5
Aug. 10 -
Aug. 15
Dec. 29 -
Jan. 4
10:00 - 14:00
9:00 - 12:00
Working hours: 10:00 - 15:00
Lunch break: 12:00 - 13:00
Day off
Day off
Day off
Day off
9:00 - 12:00
10:00 - 15:00
Workday: regarded
as Weekday.
Working hours: 9:30 - 14:00
3F
Working hours: 9:30 - 18:00
Lunch break: 12:00 - 13:00
Overtime: 18:00 - 22:00
Closing: 22:00
Same as above
Same as above
Same as above
Same as above
Day off
Same as above
Same as above
Same as above
Same as above
Day off
2F
Day off
Day off
Day off
Same as above
Same as above
Same as above
Same as above
Day off
Zone name
Day of week
1F
3F
2F
Third Saturday
of each month
Dec. 28
Jan. 5
Workday: regarded
as Weekday.
Workday: regarded
as Weekday.