4
Installation Manual 3P291714-1
DCM601A51 intelligent Touch Manager
English
Contents
1
Before Installation ................................................................................................... 7
1.1
Checking that all accessories are included ................................................................................ 7
1.2
Understanding external dimensions .......................................................................................... 8
1.3
Understanding where terminals and switches are located ...................................................... 10
1.3.1 Rear face ....................................................................................................................... 10
1.3.2 Front panel .................................................................................................................... 11
1.3.3 Side face ........................................................................................................................ 12
1.3.4 Routing of cables ........................................................................................................... 12
1.4
Determining installation place .................................................................................................. 13
1.4.1 Installation place and mounting direction ...................................................................... 13
1.4.2 Environmental conditions .............................................................................................. 13
1.4.3 Required space ............................................................................................................. 13
2 Connection
............................................................................................................. 14
2.1
Removing terminal cover from rear face .................................................................................. 14
2.2
Connecting DIII-NET-compatible air conditioning equipment
................................................... 14
2.2.1 Terminals location and conceptual connection diagram ................................................ 15
2.2.2 Requirements that must be met .................................................................................... 16
2.2.3 Precautions for using multiple centralized controllers .................................................... 16
2.3
Connecting a LAN cable
.......................................................................................................... 17
2.3.1 Terminals location and conceptual connection diagram ................................................ 18
2.3.2 Requirements that must be met .................................................................................... 18
2.4
Connecting I/O module ............................................................................................................ 19
2.4.1 Terminals location and conceptual connection diagram ................................................ 19
2.4.2 Requirements that must be met .................................................................................... 19
2.4.3 Address setup ................................................................................................................ 20
2.5
Connecting an emergency stop input device or electric energy meters .................................. 20
2.5.1 Terminals location and conceptual connection diagram ................................................ 21
2.5.2 Requirements that must be met .................................................................................... 21
2.6
Connecting iTM plus adaptors ................................................................................................. 22
2.6.1 Terminals location and conceptual connection diagram ................................................ 22
2.6.2 Requirements that must be met .................................................................................... 23
2.7
Connecting power supply ........................................................................................................ 23
2.7.1 Terminals location and conceptual connection diagram ................................................ 23
2.7.2 Requirements that must be met .................................................................................... 24
3 Installation
.............................................................................................................. 25
3.1
Wall mounting .......................................................................................................................... 25
3.1.1 Parts to be used ............................................................................................................ 25
3.1.2 Installation procedure .................................................................................................... 25
01_EN_3P291714-1.indd 4
5/18/2011 1:45:48 PM