4 Installation

Installation Manual

10

D2CNL024A1AA

Wall-mounted condensing boiler

3P469346-12R – 2021.09

4.4

To mount the unit

1

The  mounting  template  shows  the  position  for  the  horizontal
flue. If there is no hole in the wall for the flue piping, drill one. If
there  is  already  a  hole  in  the  wall  for  the  flue  piping,  you  can
use this hole as a starting point to determine the position of the
mounting  bracket,  according  to  the  template.  Flue  duct  must
incline  3°  away  from  the  unit,  to  allow  the  condensate  to  drain
back to the boiler.

>3°

200

127

200

DN100

>3°

2

Drill  holes  for  the  mounting  bracket  (Ø10  mm).  Fasten  the
mounting bracket to the wall according to mounting template.

d=10 mm

3

Hang  the  unit  on  the  bracket.  Make  sure  the  unit  is  latched  to
the bracket.

4.5

Central heating system
requirements

Expansion vessel sizing

The  boiler  is  equipped  with  an  expansion  vessel  that  has  initial
charge pressure of 1 bar.

Sufficiency  of  the  incorporated  expansion  vessel  for  the  central
heating  circuit  that  the  boiler  is  to  be  connected  to  depends  on
system  charge  pressure  and  water  temperature  circulating  in  the
circuit.

Determination  of  system  water  height  and  related  system  charge
pressure are given below:

h

p

≤6 m

0.8 bar

7 m

0.9 bar

8 m

1.0 bar

9 m

1.1 bar

10 m

1.2 bar

11 m

1.3 bar

12 m

1.4 bar

13 m

1.5 bar

h

h

System water height (m)

p

System charge pressure (bar)

In  case  system  charge  pressure  needs  to  be  more  than  1  bar,  gas
side initial charge pressure must be increased to the pressure value
that  is  equal  to  system  charge  pressure.  Make  sure  that  gas
charging  to  the  vessel  is  done  while  boiler  and  circuit  are  not
pressurized.

According  to  the  graph  below,  there  is  no  need  to  install  an
additional  expansion  vessel  for  the  systems  with  a  water  volume  in
the  area  below  the  operating  temperature  curve.  If  water  volume  is
above  the  curve,  additional  vessel  must  be  installed,  preferably  on
the return to the boiler.

A

System water volume (l)

B

System charge pressure (bar)

*

50°C-40°C temperature regime is given for underfloor
heating systems

Water treatment

Inappropriate  central  heating  circuit  water  reduces  functionality  and
efficiency of the boiler over time. Appropriate water should have:

▪ pH degree between 6.5 and 8.5

▪ Hardness less than 15°fH and 8.4°dH

Appropriate additives can be used for water treatment.

If antifreeze is needed for the system, the chosen antifreeze should
not  interact  with  rubber,  commercial  plastic  and  metal  parts  of  the
boiler that are in contact with the central heating water.

Содержание D2CNL-A1A

Страница 1: ...Installation Manual Wall mounted condensing boiler English Installation Manual Wall mounted condensing boiler D2CNL024A1AA...

Страница 2: ...e atitinka emiau nurodytus standartus ir arba kitus norminius dokumentus su s lyga kad yra naudojami pagal m s nurodymus tad ja lietoti atbilsto i ra ot ja nor d jumiem atbilst sekojo iem standartiem...

Страница 3: ...re easy to separate and the plastics are marked This allows the various components to be sorted for appropriate recycling or disposal Units are marked with the following symbol This means that electri...

Страница 4: ...thorised third parties Otherwise the unit warranty becomes void DANGER Isolate the boiler from the power mains before working on it WARNING Unit installation commissioning repair configuration and ser...

Страница 5: ...heating circuit to avoid air traps and consequent operational problems Frost protection safety system This function protects the unit and heating installation from frost damages It is controlled by t...

Страница 6: ...valve motor g Domestic hot water temperature sensor h Plate heat exchanger i Safety valve 3 bar j Condensate trap k Ignition transformer l Flue gas temperature sensor m Burner hood n Ignition electro...

Страница 7: ...products temp at nominal heat input C 90 CO2 Emission at nominal and minimum heat input G20 8 7 9 3 0 2 NOx Class 6 Energy related products ErP specifications Symbol Unit D2CNL024A1AA Model D2CNL024 C...

Страница 8: ...ualified competent persons are allowed to open the unit Certain actions explained in this document such as gas conversion optional equipment connection require that the front cover is opened 1 Loosen...

Страница 9: ...oom containing a bath or a shower then particular reference is drawn to the current I E E Wiring Regulations local Building Regulations or any other local regulations currently in service The intake a...

Страница 10: ...d related system charge pressure are given below h p 6 m 0 8 bar 7 m 0 9 bar 8 m 1 0 bar 9 m 1 1 bar 10 m 1 2 bar 11 m 1 3 bar 12 m 1 4 bar 13 m 1 5 bar h h System water height m p System charge press...

Страница 11: ...mp lift graph The residual pump lift graph shows the amount of pump lift mbar that remains for the central heating circuit 0 0 0 0 100 200 300 400 500 600 700 0 100 200 300 400 500 600 700 800 900 100...

Страница 12: ...The system must be air free to protect the boiler There are two automatic air vents on the boiler one at heat exchanger the other on the pump Ensure air is discharged completely at each water filling...

Страница 13: ...nal equipment is connected to the connectors which are located on the outside of the switch box Do not open the switch box to connect optional equipment Temperature control units Connector Connectio n...

Страница 14: ...2021 09 4 8 6 Wiring diagram DANGER RISK OF ELECTROCUTION Disconnect the power supply for more than 10 minutes before servicing X1A X2 X4 X5 X1M X2M X6A X7 1 1 1 1 1 1 1 1 1 1 1 1 1 X12 X10 X11 X17 X1...

Страница 15: ...7 Guidelines when connecting the condensate piping DANGER In order to prevent escape of flue gases and so poisoning the condensate trap must be mounted to its place before commissioning Condensate tra...

Страница 16: ...ial to ensure that products of combustion discharging from the terminal cannot re enter the building or other buildings through ventilators windows doors other sources of natural air infiltration or f...

Страница 17: ...rom separate combustion and air supply circuits shall fit inside a square of 50 cm and the distance between the planes of the two orifices shall be less than 50 cm a b e c c d d f g h L i a Roof termi...

Страница 18: ...ncentric flue system INFORMATION C63 flue type is not applicable to Belgium To install the boiler as a C63x option the following data must be used to determine the correct diameters and lengths of the...

Страница 19: ...flue system The boiler draws combustion air from outside via a separate supply pipe routed through the external wall and expels flue gas to a shared flue system The multi served chimney is a system t...

Страница 20: ...P4811 30 elbow 60 100 EKFGP4664 30 elbow 80 125 EKFGP4814 Extension duct 60 100 500 mm EKFGP4651 1000 mm EKFGP4652 Extension duct 80 125 500 mm EKFGP4801 1000 mm EKFGP4802 Tile roof outlet kit 60 100...

Страница 21: ...crews on the radiators Make sure screws are tightened after venting a a Filling valve 8 If after the venting the pressure decreases below 0 8 bar refill the system with water until the pressure reache...

Страница 22: ...ck the CO2 values at minimum capacity 5 Press CH to switch to maximum capacity H caption will appear on screen Check the CO2 values at maximum capacity 6 To quit sweeper mode press Reset button The CO...

Страница 23: ...unction of the boiler error mode Emphasise that if an error is indicated refer to Error codes in the operation manual Inform the user about frost protection function and advise never to cut off the el...

Страница 24: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P469346 12R 2021 09 Copyright 2...

Отзывы: