4 Installation
Installation manual
15
D035A1/4AB + D035A4AB
Wall-mounted condensing boiler
3P469346-5N – 2019.11
Wiring of the options that are to be connected to the internal
connectors must pop out from the inside of the unit via cable glands.
Cable glands that are sent with the unit must be assembled to the
bottom sheet of the boiler in case connection of these options.
Below, you can see the cable glands placement.
PG9
PG7 PG7
PG9
Holes on the bottom sheet that are reserved for cable glands are
covered with insulation material. The insulation material must be
bored if glands are to be used.
Note:
Unit must be opened to mount cable glands. See
Содержание D2CND028A1AB
Страница 31: ......