
Pump Down Operation
SiUS121632EA
202
Trial Operation and Field Settings
1. Pump Down Operation
Pump Down
Operation
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
1. Remove the valve caps from the liquid stop valve and the gas stop valve.
2. Carry out forced cooling operation.
3. After 5 ~ 10 minutes, close the liquid stop valve with a hexagonal wrench.
4. After 2 ~ 3 minutes, close the gas stop valve and stop the forced cooling operation.
Gas stop valve
Close
Liquid stop valve
Valve caps
Hexagonal wrench
(R14566)