8
|
Electrical installation
Installer reference guide
30
BEV2N-A
CO₂ Conveni-Pack: BEV2 unit
4P677928-1 – 2021.10
Connection to the BEV2 unit
c
c
a
f
d
d
b c
e
c
g
a
Transmission cable
b
Power supply cable
c
Tie wrap (accessory)
d
Wiring feed-through hole
e
X2A connector
f
Power supply terminal
g
Earth
Wiring example
X2A
X70A
L
L
N
N
P1P2 F1 F2 T1 T2
P1P2
F1 F2 F1 F2
b
c
d
a
N
L
IN/D OUT/D
Control box
a
Outdoor unit control box
b
Indoor unit
c
BEV2 unit
d
User interface
Содержание BEV2
Страница 1: ...Installer reference guide CO Conveni Pack BEV2 unit BEV2N112A7V1B ...
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ...4P677928 1 2021 10 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...