9
|
Finishing the indoor unit installation
Installer reference guide
39
FTXP-M + FTXF-D + FTXF-A + ATXF-A
Daikin room air conditioner
4P513661-12L – 2021.07
9 Finishing the indoor unit installation
9.1 To insulate the drain piping, refrigerant piping and interconnection
cable
1
After the drain piping, refrigerant piping and the electrical wiring are finished.
Wrap refrigerant pipes, interconnection cable and drain hose together using
insulation tape. Overlap at least half the width of the tape with each turn.
d
e
c
b
f
a
2×
a
Drain hose
b
Interconnection cable
c
Mounting plate (accessory)
d
Refrigerant piping
e
Indoor unit fixing screw M4×12L (accessory)
f
Bottom frame
9.2 To pass the pipes through the wall hole
1
Shape the refrigerant pipes along the pipe path marking on the mounting
plate.
a
b
c
c
d
e
a
Drain hose
b
Caulk this hole with putty or caulking material
c
Adhesive vinyl tape
d
Insulation tape
e
Mounting plate (accessory)
NOTICE
▪
Do NOT bend refrigerant pipes.
▪
Do NOT push the refrigerant pipes onto the bottom frame or the front grille.
Содержание ATXF50A2V1B
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ...4P513661 12L 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...