
Si041402EC
PCBs
Removal Procedure
9
6. PCBs
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1. Remove the shield plate.
1
Unfasten the hook on
the right side of the
electrical box.
2
Unfasten the 2 hooks
on the top and remove
the shield plate.
2. Remove the electrical box
cover.
Some models have [COMP],
[L] and [N] instead of [S2].
1
Disconnect the
connector [S2] for the
terminal board.
Hook
(R20072)
Hook
Shield plate
(R23418)
(R20074)
Connector(s)