
Pump Down Operation
SiBE041134EB
106
Trial Operation and Field Settings
1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
Detail
1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 ~ 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 ~ 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 107 for forced cooling operation.
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R13628)
Hexagonal
wrench