3
|
Components
Service manual
178
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03
Are the test results OK?
Action
Yes
Power modules are OK. Return to
main PCB and continue with the next
procedure.
No
Problem solved?
After all checking procedures listed above have been performed:
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
Repair procedures
To remove the main PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
230].
1
Remove the 3 bolts from the main PCB heat sink cover.
2
Lift and pull the cover to remove it from the heat sink.
d
a
a
a
b
c
c
c
e
d
d
d
d
d
d
d
d
d
d
d
d
d
d
d
a
Heat sink cover screw
b
Heat sink cover
c
Wires LC, NC, U, V and W
d
PCB fixation screw
e
Main PCB
3
Disconnect all connectors from the main PCB.
Содержание ALTHERMA
Страница 357: ...11 11 ...
Страница 358: ......
Страница 359: ......
Страница 360: ...ESIE20 06A 2021 03 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...