Outdoor Unit Functional Concept
ESIE06-03
2–26
Part 2 – Functional Description
3
1
2
4
5
Detect
disconnection
When the 630-seconds timer for open control is over, the following adjustment must be made.
P
When the operation mode is cooling
When the following condition is fulfilled, the discharge pipe thermistor disconnection is ascertained.
Discharge pipe tempe6°C < outdoor heat exchanger temperature.
P
When the operation mode is heating
When the following condition is fulfilled, the discharge pipe thermistor disconnection is ascertained.
Discharge pipe tempe6°C < indoor heat exchanger temperature.
3.11.7 Control when frequency is changed
When the target discharge pipe temperature control is active, if the target frequency is changed for a
specified value in a certain time period, cancel the target discharge pipe temperature control and
change the target opening of the electronic expansion valve according to the shift.
3.11.8 Target Discharge Pipe Temperature Control
Obtain the target discharge pipe temperature from the indoor and outdoor heat exchanger
temperature, and adjust the electronic expansion valve opening so that the actual discharge pipe
temperature become close to that temperature. (Indirect SH control using the discharge pipe
temperature).
Determine a correction value of the electronic expansion valve compensation and drive it according to
the deflection of the target discharge temperature and actual discharge temperature, and the
discharge temperature variation by the 20 sec.
Set the target discharge pipe
temperature as to become an aiming
SH.
Regard that the inclination cannot be
changed due to the operating
condition.
SC
SH
Содержание Altherma EKHBH Series
Страница 2: ...ESIE06 03 1 2 Part 1 System Outline 3 1 1 5 ...
Страница 26: ...Functional Diagrams ESIE06 03 1 26 Part 1 System Outline 3 1 1 4 5 ...
Страница 32: ...Piping Diagrams ESIE06 03 1 32 Part 1 System Outline 3 1 1 4 5 ...
Страница 38: ...Switch Box Layout ESIE06 03 1 38 Part 1 System Outline 3 1 1 4 5 ...
Страница 58: ...PCB Layout ESIE06 03 1 58 Part 1 System Outline 3 1 1 4 5 ...
Страница 60: ...ESIE06 03 2 2 Part 2 Functional Description 3 1 2 5 ...
Страница 68: ...Hydro box Functional Concept ESIE06 03 2 10 Part 2 Functional Description 3 1 2 4 5 ...
Страница 88: ...ESIE06 03 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Страница 134: ...Error Codes System Malfunctions ESIE06 03 3 48 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 152: ...Additional Checks for Troubleshooting ESIE06 03 3 66 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 154: ...ESIE06 03 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...
Страница 180: ...Removal procedure outdoor unit ERYQ005 007AAV3 ESIE06 03 5 28 Part 5 Disassembly and Maintenance 3 1 5 5 ...