6/12
Breadcrumb Field code
Setting name
Range, step
Default value
Date
Value
Field settings table
Installer setting at variance with
default value
9.1.B.1
[6-0D]
R/W
0: Reheat only
1: Sc reheat
2: Scheduled only
9.1.B.2
[6-0A]
R/W
30~[6-0E]°C, step: 1°C
60°C
9.1.B.3
[6-0B]
R/W
30~min(50, [6-0E])°C, step: 1°C
45°C
9.1.B.4
[6-0C]
R/W
30~min(50, [6-0E])°C, step: 1°C
45°C
9.1.B.5
[6-08]
R/W
2~20°C, step: 1°C
10°C
└─
Domestic hot water
9.2.1
[E-05]
[E-06]
[E-07]
R/O
3: Integrated
9.2.2
[D-02]
R/W
0: No DHW pump
1: Instant hot water
2: Disinfection
3: Circulation
4: Circulation and disinfection
9.2.4
[D-07]
R/O
0: No
1: Yes (DHW)
2: Yes (DHW + SH)
└─
Back up heater
9.3.1
[E-03]
R/O
3: 6V (*1)
4: 9W (*2)
9.3.2
[5-0D]
R/W (*1)
R/O (*2)
0: 230 V, 1~ (*1)
1: 230 V, 3~ (*1)
2: 400 V, 3~ (*2)
9.3.3
[4-0A]
R/W
0: 1
1: 1/1+2 (*1)(*2)
2: 1/2
3: 1/2 + 1/1+2 in emergency
9.3.4
[6-03]
R/W
0~10 kW, step: 0,2 kW
2 kW (*1)
3 kW (*2)
9.3.5
[6-04]
R/W
0~10 kW, step: 0,2 kW
4 kW (*1)
6 kW (*2)
9.3.6
[5-00]
R/W
0: No
1: Yes
9.3.7
[5-01]
R/W
-15~35°C, step: 1°C
0°C
9.3.8
[4-00]
R/W
0: Restricted
1: Allowed
2: Only DHW
└─
Booster heater
9.4.1
[6-02]
R/W
0~10 kW, step: 0,2 kW
0 kW
9.4.3
[8-03]
R/W
20~95 min, step: 5 min
50 min
9.4.4
[4-03]
R/W
0: Restricted
1: Allowed
2: Overlap
3: Compressor off
4: Legionella only
└─
Emergency
9.5
[4-06]
R/W
0: Manual
1: Automatic
2: Auto red SH/ DHW ON
3: Auto red SH/ DHW OFF
4: Auto normal SH/ DHW OFF
9.5.2
[7-06]
R/W
0: Disabled
1: Enabled
└─
Balancing
9.6.1
[5-02]
R/W
0: Disabled
1: Enabled
9.6.2
[5-03]
R/W
-15~35°C, step: 1°C
0°C
9.6.3
[5-04]
R/W
0~20°C, step: 1°C
10°C
9.6.4
[8-02]
R/W
0~10 hour, step: 0,5 hour
0,5 hour
9.6.5
[8-00]
R/W
0~20 min, step: 1 min
1 min
9.6.6
[8-01]
R/W
5~95 min, step: 5 min
30 min
9.6.7
[8-04]
R/W
0~95 min, step: 5 min
95 min
Installer settings
9.7
[4-04]
R/W
0: Continuous pump operation
1: Non continuous pump operation
2: OFF
└─
Benefit kWh power supply
9.8.2
[D-00]
R/W
0: No
1: Only BSH
2: Only BUH
3: All
9.8.3
[D-05]
R/W
0: No
1: Yes
9.8.4
[D-01]
R/W
0: No
1: Open
2: Closed
3: Smart Grid
Water pipe freeze prevention
Allow heater
Allow pump
Benefit kWh power supply
Priority temperature
Offset BSH setpoint
Anti-recycle timer
Minimum running timer
Maximum running timer
Additional timer
Capacity
BSH eco timer
Operation
Emergency
Compressor forced off
Space heating priority
Configuration
Capacity step 1
Additional capacity step 2
Equilibrium
Equilibrium temperature
Operation
Hysteresis
Domestic hot water
DHW pump
Solar
BUH type
Voltage
Heat up mode
Comfort setpoint
Eco setpoint
Reheat setpoint
4P717810
‐
1
‐
2022.11
(*1)
*6V*_(*2)
*9W*_
(*3)
Only
applicable
for
models
where
cooling
is
possible