![Daikin Altherma 3 H MT ECH2O Скачать руководство пользователя страница 66](http://html.mh-extra.com/html/daikin/altherma-3-h-mt-ech2o/altherma-3-h-mt-ech2o_installers-reference-manual_501180066.webp)
7
|
Unit installation
Installer reference guide
66
EPRA08~W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1 – 2021.07
7 Unit installation
In this chapter
7.1 Preparing the installation site
Choose an installation location with sufficient space for carrying the unit in and out
of the site.
Do NOT install the unit in places often used as work place. In case of construction
works (e.g. grinding works) where a lot of dust is created, the unit MUST be
covered.
WARNING
The appliance shall be stored in a room without continuously operating ignition
sources (example: open flames, an operating gas appliance or an operating electric
heater).
7.1.1 Installation site requirements of the outdoor unit
INFORMATION
Also read the precautions and requirements in the
10].
Mind the spacing guidelines. See
"16.1 Service space: Outdoor unit"
NOTICE
▪
Do NOT stack the units on each other.
▪
Do NOT hang the unit on a ceiling.
Содержание Altherma 3 H MT ECH2O
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ...4P663478 1 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...