
7
|
Unit installation
Installer reference guide
77
EPRA08~W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1 – 2021.07
±120
kg
4×
2
Fix the unit to the installation structure.
4× M12
3
Remove the slings (and screws), and dispose of them.
4×
7.3.5 To provide drainage
▪
Make sure that condensation water can be evacuated properly.
▪
Install the unit on a base to make sure that there is proper drainage in order to
avoid ice accumulation.
▪
Prepare a water drainage channel around the foundation to drain waste water
away from the unit.
Содержание Altherma 3 H MT ECH2O
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ...4P663478 1 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...