![Dahua Villa VTO Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/dahua/villa-vto/villa-vto_quick-start-manual_3441332019.webp)
11
2
Mounting and Debugging
2.1
Mounting
Don’t install VTO in bad environment, such as condensation, high temperature, stained,
dusty, chemically corrosive, direct sunshine or completely unsheltered environment.
Engineering mounting
and debugging shall be done by professional teams. Please don’t
dismantle or repair arbitrarily in case of device failure.
2.1.1 VTO6210B and VTO6210BW
Before installing the bracket or flush mount box, cables in the wall shall be led through the
bracket or flush mount box.
Mounting method of VTO6210B and VTO6210BW is the same. Take
“VTO6210B” for example.
Step 1 Fix the mounting bracket onto the wall.
1. Fix the bracket onto 86 box with M4 screws. Screw holes are located in Points 3 as
shown in the figure.
2. To strengthen product firmness, tighten it with ST3.0 screws in Points 4 as shown
in the figure.
Step 2
Connect cables. Please refer to “1.1.2 Rear Panel” for details.
Step 3 Put the bare device onto the mounting bracket; fit the upper edge first and then push
the lower edge gently.
Step 4 Fix the whole device onto the bracket with M3 screws.
Содержание Villa VTO
Страница 1: ...Villa VTO Version 3 1 Quick Start Guide V1 0 1...
Страница 16: ...8 Figure 1 13 Figure 1 14...
Страница 18: ...10 Figure 1 17...
Страница 22: ...14 Figure 2 3 Step 4 Fix the bare device onto sheet metal bracket with M3 6 screws Figure 2 4...
Страница 38: ...30 Figure 2 27...