22
2-1. Spin Sequence
1) Drain
① It follows Drainage Sequence.
2) Balance Spin
① If Unbalance Check pass, Start R-Spin.
② B-Spin is Until Unbalance check section, 400 r.p.m
3) R(Real) Spin
① From end of B-Spin to end of Spin Sequence is R Spin.
② r.p.m is affected by sequence
2-2. End
1) Crease Care
① Crease Care is process of removal laundry that stick to drum. It works 1min ,after Spin
Sequence.
② Wool and Shoes course don't work crease care
2) End
① After 10 sec power off ,alamed END.
② If drying sequence added, drying sequence works.
③ After END , door unlock.
2. Skill of Spin and Dry Sequences
WFW0A1*,WFW0A2*,WFC0A2*(SM).indd 22
16. 5. 24. 오후 3:20