Page 10
Specifications for Solar 200W-V
Return to Master Table of Contents
HYDRAULIC CYLINDERS
Boom
Arm
Bucket
Blade
Stabilizer
Chocking
Quantity
2
1
1
2
2
2
Bore
120 mm
(4.72 in.)
135 mm
(5.31 in.)
115 mm
(4.53 in.)
130 mm
(5.12 in.)
130 mm
(5.12 in.)
100 mm
(3.94 in.)
Stroke
1,280 mm
(50.39 in.)
1,536 mm
(60.47 in.)
1,050 mm
(41.34 in.)
175 mm
(6.89 in.)
391 mm
(15.39 in.)
153 mm
(6.02 in.)
Rod Dia.
85 mm
(3.35 in.)
95 mm
(3.74 in.)
75 mm
(2.95 in.)
80 mm
(3.15 in.)
80 mm
(3.15 in.)
100 mm
(3.94 in.)
Closed Length
1,810 mm
(71.26 in.)
2,105 mm
(82.87 in.)
1,640 mm
(64.57 in.)
615 mm
(24.21 in.)
858 mm
(33.78 in.)
267 mm
(10.51 in.)
Retract. Cushion
X
O
X
X
X
X
Extend. Cushion
O
O
O
X
X
X
Maker
Dongyang
Dongyang
Dongyang Dongyang
Dongyang
Dongyang
Содержание Solar 200W-V
Страница 1: ...Shop Manual 2023 7139E Serial Number 0001 and Up March 2000 Solar 200W V...
Страница 3: ......
Страница 6: ...Return to Master Table of Contents 1SAFETY...
Страница 28: ...S0102020 Page 22 Wheel Excavator Safety Return to Master Table of Contents...
Страница 29: ...Return to Master Table of Contents 1SPECIFICATIONS...
Страница 30: ...Return to Master Table of Contents...
Страница 37: ...S0202040 Page 7 Specifications for Solar 200W V Return to Master Table of Contents...
Страница 57: ...Return to Master Table of Contents 1GENERAL MAINTENANCE...
Страница 58: ...Return to Master Table of Contents...
Страница 72: ...S0302000 Page 14 General Maintenance Procedures Return to Master Table of Contents...
Страница 85: ...Return to Master Table of Contents 1UPPER STRUCTURE...
Страница 86: ...Return to Master Table of Contents...