
9
4. Unplug the following connectors from the control circuit board:
a) 2-Pin connector at CN1.
b) 2-Pin connector on relay RY1.
c) 7-Pin connector at CN3.
d) Lift the end of the locking arm on the ribbon cable at CN2, then lift the ribbon cable out of the socket.
5. Remove 4 screws from the control circuit board and lift the board off the mounting bracket.
6. Clean the surface of the new display and the inside of the control panel window with a soft, damp cloth to remove any
dirt, smudges, or lint.
7. Mount the new control circuit board to the mounting bracket with 4 screws.
8. Plug the following connectors over their control circuit board plugs so that they lock into place:
a) 2-Pin connector at CN1.
b) 2-Pin connectors on relay RY1.
c) 7-Pin connector at CN3.
d) Insert the end of the ribbon cable into the narrow slot of connector CN2 as far as it will go(See DETAIL CN2).
Lower the locking arm so that the two small tabs fit into the cutouts of the ribbon cable, then press down so that it
locks into place.
9. Mount the control panel to the oven and secure it with its mounting screw.
10. Mount the vent grille to the microwave oven and check out the operation.
FIG. 2-1
Содержание KOT-1G1A
Страница 8: ...7 FIG 1...
Страница 39: ...38 WIRING DIAGRAM 1 WIRING DIAGRAM...
Страница 49: ...48 MP1 MP2 3 PRINTED CIRCUIT BOARD FILM...
Страница 50: ...49 4 PCB CIRCUIT DIAGRAM...
Страница 54: ...53 3 TOTAL ASSEMBLY KOT 1G1A...