14
Installation Instructions
Cabinet Blower Installation
(Optional: MRV3015M/S, MRV3615M/S)
1. Find the wiring diagram label included with the adapter
kit. Remove the protective backing, and place it over the
existing label on the CABP3 blower as shown.
2. Find the foam tape supplied with the downdraft vent.
Place the blower on the floor as it will be mounted on
the front of the downdraft vent. Remove the backing
from the foam tape, and attach it to the right and left
flanges of the blower base plate.
3. With the exhaust oriented as desired, slide the bottom
flange of the CABP3 blower base plate behind the tab
on the bottom of the adapter mounted to the front of the
downdraft vent.
4. Cover the adapter opening by pushing the blower
against it. Ensure the foam tape creates a good seal on
the right and left side of the opening. Center the blower
base plate horizontally over the adapter’s front opening.
5. Install the adapter top retainer bracket over the blower
base plate flange. Secure it with the 3 wing nuts, lock
washers, and flat washers included with the adapter.
CABP3
Top retainer
bracket
Insert bottom flange into
tab at bottom of adapter
Attach foam
to right/left
flanges
Adapter
New label
Existing
label
ILHSF or REMP Series Blower Installation
If using a ILHSF or REMP series blower, install it according
to the blower installation instructions.
Duct Work Installation
WARNING
For best performance and to keep smoke, odors, and
combustion byproducts from entering the home, tape all
duct joints securely.
Install the duct work per the
Installation Specifications
section. Use sheet-metal screws and duct tape to connect
and seal all pieces. Support the duct weight as needed to
ensure sealed joints.
Electrical Installation
WARNING: ELECTRIC SHOCK HAZARD
• Plug in the downdraft vent
after
installation is complete.
• Follow the wiring diagram carefully. Do not change the
factory-wired terminal connections inside the electrical-
access panel for the downdraft vent or blower.
• Route wiring away from hot surfaces.
1. For ILHSF and REMP blower installations, run the wir-
ing/conduit line used to supply power from the downdraft
vent to the blower parallel to the duct work.
2. Remove the cover from the downdraft vent electrical-
access panel.
3. Connect the wiring/conduit to the blower as shown on
pgs. 15 and 17 per local ordinances. Ensure all terminal
connections (including factory-wired connections) are
tight. Replace the electrical-access panel.
Range/Cooktop Installation
Install the range or cooktop as instructed.