
DHW Series Hood Recirculation Kit
Page 3
STEP 9
Using sheet metal screws and duct tape,
attach the end of the duct length cut in
step 8 to the collar/cowling on the top of the
hood. Use a level to make sure the duct is
vertical. Drill pilot holes as necessary for the
sheet metal screws.
STEP 10
Attach the top cap to the top of the duct in-
stalled in step 9.
Top cap
Duct
STEP 11
Install the hood chimney according to the
Final Chimney Assembly
section of the
hood installation instructions.
continued...