ENGLISH
37
CONTENTS
1.
WARNINGS .............................................................................................................................................. 38
2.
Responsibility ......................................................................................................................................... 38
3.
MANAGEMENT ....................................................................................................................................... 38
3.1
Storage ............................................................................................................................................. 38
3.2
Transport .......................................................................................................................................... 38
4.
EXAMPLE OF INSTALLATION .............................................................................................................. 39
4.1
Dimensions and weights ................................................................................................................ 40
5.
TANK INSTALLATION ............................................................................................................................ 41
5.1
Placing the tank inside the building .............................................................................................. 41
5.2
Placing the tank outside the building ........................................................................................... 41
5.3
Making holes for the collection and ventilation pipes ................................................................ 42
5.4
Gluing the collection and ventilation pipes .................................................................................. 42
5.5
Connecting the delivery pipe to the sewer network .................................................................... 43
5.6
Connecting the ventilation pipe ..................................................................................................... 43
5.7
Closing the cover ............................................................................................................................ 43
5.8
Provision for emergency drainage ................................................................................................ 44
5.9
Non-return valve .............................................................................................................................. 44
5.10
Interception gate valve ................................................................................................................... 44
6.
PUMP INSTALLATION ............................................................................................................................ 45
7.
ELECTRICAL CONNECTIONS AND ADJUSTMENT OF FLOATS ....................................................... 50
7.1
Choice of the electric control panel .............................................................................................. 50
7.2
Electrical connections .................................................................................................................... 50
8.
PREPARATION OF THE ALARM SYSTEM FOR FEKAFOS 280 AND 280 DOUBLE (SUPPLIED
ONLY ON REQUEST FOR FEKABOX 200) .................................................................................................. 52
9.
FIRST START-UP .................................................................................................................................... 53
9.1
Operating flow rate ......................................................................................................................... 53
9.2
Operation ......................................................................................................................................... 53
10.
MAINTENANCE ....................................................................................................................................... 53
11.
TROUBLESHOOTING ............................................................................................................................. 54
12.
DISPOSAL ............................................................................................................................................... 54
Содержание FEKAFOS 280
Страница 112: ...110 1 1 1 1 2 IEC 364 1 3 1 4 En 12050 1 1 5 1 6 3 4 5 Fekabox Fekafos 100 2 3 3 1 3 2...
Страница 113: ...111 4 ESEMPIO DI INSTALLAZIONE FEKABOX FEKAFOS FEKABOX FEKAFOS 1 5 2 6 3 7 4 8 e box fekafos 4 2 1 8 5 7 3 6 1 2 3...
Страница 114: ...112 4 1 Fekabox 200 Fekafos 280 280 Double Fekafos 550 Double...
Страница 115: ...113 5 Fekabox Fekafos 4 5 1 2 3 Fekabox 200 Fekabox 280 Fekabox 550 Double 100 1 4 60 5 2 4 TEM8 ISO 7093...
Страница 117: ...115 5 5 Fekabox 200 Fekafos 280 Fekafos 550 2 GAS PP 5 6 5 3 5 7 6B 6A 6A 6B...
Страница 118: ...116 5 8 5 9 1 5 10 4...
Страница 124: ...122 7 7 1 Fekafos 280 280 Double Fekafos 550 Double Fekabox Dab ED E BOX 7 2 Dab 4G1 5 2 10 Fekafos 280...
Страница 127: ...125 9 5 7 9 1 0 7 2 3 9 2 10...
Страница 128: ...126 11 1 A B C D E F G A B 280 C D F G 2 A A 12 e 1 2 Dab Pumps...
Страница 166: ...164 1 1 1 1 2 IEC 364 1 3 1 4 En 12050 1 1 5 1 6 3 4 5 Fekabox Fekafos 100 Kg 2 3 3 1 3 2...
Страница 167: ...165 4 FEKABOX FEKAFOS FEKABOX FEKAFOS 1 5 2 6 3 7 4 8 e box fekafos 4 2 1 8 5 7 3 6 1 2 3...
Страница 168: ...166 4 1 Fekabox 200 Fekafos 280 280 Double Fekafos 550 Double...
Страница 169: ...167 5 Fekabox Fekafos 4 5 1 2 3 Fekabox 200 Fekafos 280 Fekafos 550 Double 100 Kg 1 4 60 cm 5 2 4 TE M8 ISO 7093...
Страница 171: ...169 5 5 Fekabox 200 Fekafos 280 Fekafos 550 2 GAS PP PVC 5 6 5 3 5 7 O ring 6B 6A 6B 6A...
Страница 172: ...170 5 8 5 9 5 10 4...
Страница 178: ...176 7 7 1 Fekafos 280 280 Double Fekafos 550 Double Fekabox ED E BOX 7 2 Dab 4G1 5 mm2 10 Fekafos 280...
Страница 181: ...179 9 5 7 9 1 0 7 m s 2 3 m s 9 2 10...
Страница 182: ...180 11 1 280 2 A A 12 1 2 Dab Pumps...
Страница 202: ...200 1 1 1 1 2 IEC 364 1 3 1 4 EN 12050 1 1 5 1 6 3 4 5 Fekabox Fekafos 100 2 3 3 1...
Страница 203: ...201 3 2 4 FEKABOX FEKAFOS FEKABOX FEKAFOS 1 5 2 6 3 7 4 8 Fekafos 4 2 1 8 5 7 3 6 1 2 3...
Страница 204: ...202 4 1 Fekabox 200 Fekafos 280 280 Double Fekafos 550 Double...
Страница 205: ...203 5 Fekabox Fekafos 4 5 1 2 3 Fekabox 200 Fekafos 280 Fekafos 550 100 1 4 60 5 2 4 TE M8 ISO 7093...
Страница 207: ...205 5 5 Fekabox 200 Fekafos 280 2 5 6 5 3 5 7 6B 6A 6A 6B...
Страница 208: ...206 5 8 5 9 1 5 10 4...
Страница 214: ...212 7 7 1 Fekafos 280 280 Double i 550 Double Fekabox Dab ED E BOX 7 2 Dab 4G1 5 2 10 Fekafos 280...
Страница 217: ...215 9 5 7 9 1 0 7 2 3 9 2 10...
Страница 218: ...216 11 1 A B C D E F G A B 280 C D F G 2 A A 12 1 2 Dab Pumps...
Страница 256: ...254 1 1 1 1 2 IEC 364 1 3 1 4 En 12050 1 1 5 1 6 3 4 5 Fekabox Fekafos 100 2 3 3 1 3 2...
Страница 257: ...255 4 FEKABOX FEKAFOS FEKABOX FEKAFOS 1 5 2 6 3 7 4 8 fekafos 4 2 1 8 5 7 3 6 1 2 3...
Страница 258: ...256 4 1 Fekabox 200 Fekafos 280 280 Double Fekafos 550 Double...
Страница 261: ...259 5 6 5 3 5 7 O B A 6A 6B...
Страница 262: ...260 5 8 5 9 1 5 10 4...
Страница 268: ...266 7 7 1 Fekafos 280 280 550 Fekabox DAB ED E BOX 7 2 4G1 5 DAB 11 Fekafos 280 10 Fekafos 280 280D 4G1 5mm2 7...
Страница 270: ...268 2 Fekabox 200 510 mm Fekafos 280 280D 680mm ED E2D AS1 9 5 7 9 1 0 7 2 3 Fig 12...
Страница 271: ...269 9 2 10 11 1 A B C D E F G A B 280 550 C D F G 2 A A 12 1 2 Dab Pumps...