background image

9

Installation (continued)

17.  Raise the screen assembly into the wall opening. On the 

projector side, one person will remain holding all three ropes 
without slack, guiding the screen into place. On the audience 
side, two people will lift the screen vertically, one on the left 
and one on the right side.  These three people (one rope 
control and two lifters) will coordinate together to lift the 
screen into place. The fourth person should be on a ladder on 
the projector side helping the rope control and lifters guide 
the screen assembly into place until all three hoisting and 
lifting brackets attach to each other at the top of the wall 
opening (See Figure 8).

 

NOTE:

 During this step, be careful not to touch the projection 

coating on the audience facing side of the screen assembly 
along the screen edges.

 

NOTE:

 At the end of this step, the screen assembly’s weight 

should be supported by the hoisting and lifting brackets and 
it should be inside of the wall opening.

Figure 8

T-Track

2⅛"

Lifting Bracket

Hoisting 

Bracket

Screen Assembly 

(Audience Side)

Содержание Polacoat Da-Plex Semi-Rigid

Страница 1: ...INSTRUCTION BOOK FOR Polacoat Da Plex Semi Rigid Screen ...

Страница 2: ...reen is to be installed NOTE Please read through the installation steps and note wait times The rolled screen surface needs to be acclimated to the room for 48 hours prior to installation Step 1 Once the surface is unrolled it will need to lay in its unrolled state for 4 hours Step 2 Screen Orientation Polacoat In Wall rigid rear projection screens have a polished surface and a matte coated surfac...

Страница 3: ... a soft clean lint free cloth Dry Soil Marks Clean with VM P Naptha or with Da Lite Lenskleen and a soft clean lint free cloth Cleaning of Frame and Trim The exposed surfaces of the aluminum frames can be cleaned with a dilute solution of detergent and water followed by a clear water rinse Use a soft grit free cloth to preserve the anodized finish Protect screen surface during frame cleaning Do no...

Страница 4: ...nrolling the screen ensure that the edge end of the surface is nearest to the floor While maintaining slight pressure on the roll cut each piece of tape wrapped around the roll at the edge end of the surface Once all tape pieces have been cut the screen surface can be unrolled This should be done gently and in at a measured pace to prevent damage to the surface There will be elastic potential ener...

Страница 5: ...g the other 4 piece of trim as a guide secure the opposite end of the T track section on the end hole with a 10 screw Once both ends are attached slide the 4 trim pieces along the track to align the other positions and attach a 10 screw into the hole openings until completed See Figure 2 NOTE Sliding the trim along the T track will maintain the proper alignment when attaching the T track to the wa...

Страница 6: ...ection of the screen in the opposite corner See Figure 4 8 Position the third lifting bracket 2 from the back of the T track in the center of the top section of the wall opening and mount with 1 4 X 1 lag screws See Figure 4 NOTE After completing this step there should be three lifting brackets mounted into the top section of the wall opening behind the T track Check that these brackets are secure...

Страница 7: ... sections around the screen surface Attach to frame over the rubber gasket with set screws facing upwards Use a rubber mallet to gently tap the screen frame into place if needed See Figure 5 12 Starting from the center on each side tighten all set screws on all four sides of the frame using the 1 8 hex key Approximately two threads should be visible on each set screw when properly tightened 13 Pla...

Страница 8: ...s being lifted WARNING Do not lift the screen into place if the ropes have not been fed through the hoisting and lifting brackets Figure 6 Figure 7 16 Lift the screen assembly to a vertical position on the floor parallel to the wall opening On the projector side of the wall opening one person will be holding all three ropes without slack and guiding the screen to an upright position On the audienc...

Страница 9: ...rson should be on a ladder on the projector side helping the rope control and lifters guide the screen assembly into place until all three hoisting and lifting brackets attach to each other at the top of the wall opening See Figure 8 NOTE During this step be careful not to touch the projection coating on the audience facing side of the screen assembly along the screen edges NOTE At the end of this...

Страница 10: ...hed tensioning assemblies 21 Tighten the remaining tensioning assemblies on the top section of the screen assembly until all eight four per frame section are evenly spaced and secure on the top side NOTE Use the alternating method of two to three turns on one assembly then moving on to another assembly to prevent the bolts and nuts from binding 22 At the bottom section align the T track and the fr...

Страница 11: ...11 ...

Страница 12: ...ite transportation expenses to and from Da Lite are payable by the purchaser and Da Lite is not responsible for damage in shipment To protect yourself against damage or loss in transit insure the product and prepay all transportation expenses TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING WARRANTIES AS TO FITNESS FOR ...

Отзывы: