10. FINAL CHECK AND TEST RUN
10.1 Check item table after installation
Checking item
Description
Yes
No
Whether installing site
is meet for requirements
Whether water system
is meeting for
requirements
Whether electric wiring
system is meeting for
requirements
Units are fixed mounting on level base.
Ventilating space for heat exchanger at the
air side is correct
Maintenance space is correct.
Noise and vibration is correct.
Sun radiation and rain or snow proof measures are
corrects.
External physical is correct.
Pipe diameter is correct
Water discharge is correct
Water quality control is correct
Flexible pipe’s connetion is correct
Pressure control is correct
Thermal insulation is correct
Switch capacity is correct
Fuse capacity is correct
Voltage and frequency are correct
Connecting tightly between wires
Operation control device is correct
Safety device is correct
Chained control is correct
Phase sequence of power supply is meeting for
requirement
Table 10-1
37
Installation Manual___________________________________________________________________________________