25
2.5
Deployment
Please refer to the following topology and have all the connections ready.
Figure 2.5.1 (DSN-6120)
Figure 2.5.2 (DSN-6110)
1.
Setup the hardware connection before power on servers. Connect console cable,
management port cable, and iSCSI data port cables in advance.
2.
In addition, installing an iSNS server is recommended for dual controller system.
3.
Power on DSN-6110/6120 and DSN-6020 (optional) first, and then power on hosts
and iSNS server.
Содержание DSN-6110
Страница 70: ...70 4 5 1 Hardware monitor Hardware monitor can view the information of current voltages and temperatures ...
Страница 128: ...128 Figure B 4 Figure B 5 8 Click OK Figure B 6 Figure B 7 ...
Страница 134: ...134 Step 3 Click confirm The system will ask you to shutdown Please shutdown IP SAN storage Click Ok ...