DGS-3130 Series Layer 3 Stackable Managed Switch Hardware Installation Guide
33
Figure 3-5 Insert Tie Wrap into the Switch
2. Plug the AC power cord into the power socket of the Switch.
Figure 3-6 Connect the power cord to the Switch
3. Slide the retainer through the tie wrap until the end of the cord.
Figure 3-7 Slide the Retainer through the Tie Wrap
4. Circle the tie of the retainer around the power cord and into the locker of the retainer.