DES-3226L Layer 2
Fast Ethernet Switch User’s Guide
Mounting the Switch in a standard 19” rack.
Figure 2-3. Installing Switch in a rack
Power On
Plug one end of the AC power cord into the power connector of the Switch and the other end
into the local power source outlet.
After the Switch is powered on, the LED indicators will momentarily blink. This blinking of
the LED indicators represents a reset of the system.
Power Failure
As a precaution, in the event of a power failure, unplug the Switch. When power is resumed,
plug the Switch back in.
10
Содержание DES-3226L
Страница 1: ...D Link DES 3226L Managed 24 port 10 100Mbps and 2GE ports Layer 2 Ethernet Switch Manual...
Страница 5: ...Cable Lengths 109 Glossary 110...
Страница 111: ...DES 3226L Layer 2 Fast Ethernet Switch User s Guide Figure 6 45 IGMP Snooping Configurations Edit window 99...
Страница 134: ...122...