
POWER UP AND INSTALLATION
Q200 User Manual
7-2
200120/Revision 10
Note that, in the above printout, XXX represents the software language option and
version.
Once the self-check routines are completed the instrument detector will be heated until
it reaches its working temperature of 50
O
C, a process that takes approximately ten
minutes. During this period the instrument's configuration sequence will be displayed,
with a two-second delay between each display update:
**** Warming Up ****
Gas SF6
Units ml/s
Cal Off
Al 1.0x10-6ml/s
Throughout the initialisation routine the hand unit warning LED is illuminated. The hand
unit bar graph is used to indicate how much time is left before the instrument is
operational (full scale being ten minutes).
Once the instruments' detector has reached its working temperature it will sound a two-
tone audible signal then enter standby mode, if the key-switch is in either of the run
positions the display will show:
Standby
If the key-switch is in the program position the display will show:
Calibrate
Содержание Q200
Страница 1: ...Uson Q200 User Manual Revison 10 Updated September 2018...
Страница 3: ......
Страница 7: ......
Страница 11: ......
Страница 19: ......
Страница 21: ......
Страница 33: ......
Страница 47: ......
Страница 59: ......
Страница 63: ......
Страница 67: ......
Страница 75: ......
Страница 79: ......
Страница 81: ......
Страница 83: ......
Страница 89: ......
Страница 91: ......