SERVICE
BULLETIN
Czech Sport Aircraft a.s.
Na Záhonech 212,
686 04 Kunovice
Czech Republic
No.: SB-SC-055
Date: 2018-08-20
Rev.: -
Page: 9 of 25
Date: -
d)
Remove the drilling jig 1-111-0028 from the wing, the pre-drilled hole Ø 2.4 mm intended for
the sleeve of the connection CE0271N to be drilled to Ø 6.0 mm and then to Ø 9.0 mm, then deburr
the hole (see Fig. 13).
e)
Insert the connection CE0271N (see Fig. 14) into the hole made according to section 10 d),
set the connection to the position shown in Fig. 15, 16 (see the hole for rivet marked with a center
punch and red dot), attach the connection to the rib of the fuel tank by cleco fastener.
Fig. 13
Connection CE0271N
Fig. 14
Содержание SportCruiser
Страница 25: ......