Cygnus DIVE Operating Manual
M3-DIVE-M-ENG_Iss9.docx
Page 17 of 117
The probe connector can be plugged into
either of the connectors on the DIVE
gauge body depending on which arm the
DIVE gauge is worn on.
The connector is a simple push-fit. The
white dots must be aligned for the
connectors to mate.
To release the probe connector you must
pull back the connector front part of the
body (A) as you pull the connector out of the
gauge body.
If the connector appears tight push the back
part (B) in towards the gauge while pulling
back on the front part (A).
Probe Calibration Check Message
If you connect a probe while the gauge is
turned on a message reminding you to
check the calibration will be displayed.
Press either button to continue.
A
B
Содержание M3-DIVE
Страница 12: ...Cygnus DIVE Operating Manual M3 DIVE M ENG_Iss9 docx Page 12 of 117 Security Lanyard fitted to D ring...
Страница 113: ...Cygnus DIVE Operating Manual M3 DIVE M ENG_Iss9 docx Page 113 of 117 28 Connection Diagram Umbilical Cable...
Страница 114: ...Cygnus DIVE Operating Manual M3 DIVE M ENG_Iss9 docx Page 114 of 117 29 Connection Diagram Umbilical to TSR...
Страница 115: ...Cygnus DIVE Operating Manual M3 DIVE M ENG_Iss9 docx Page 115 of 117 30 Connection Diagram DIVE to Umbilical...