background image

Page 2 of 5 

 

2.

 

WallRack 

“Angle

-

Bracket”

 

Installation: 

 

A.

 

Tools & Fasteners 
 

 

3/8” 

Impact Drill 

 

1/2

” x 3” Long 

Carbide Drill Bit 

 

(2) 5/16” 

Lag Shields 

 

Part #17504 

{Included} 

 

(2) 5/16” x 2

-

1/2” Long 

Lag 

 

Screws Part #17505 

{Included}  

 

T-30 Torx Driver {5/16

 Screw} 

 

T-45 Torx Driver {3/8

 Screw} 

 

(2) 3/8-

16NC X 1” 

BHCS 

Torx Screw

 

Part #12724 

{Included} 

 

(2) 3/8-16NC Serrated 

Flange Nut

 

Part #12688 

{Included} 

 

Pencil 

 

Hammer 

 

Tape Measure 

 

9/16” Hex Wrench

 

 

Concrete Adhesive 

 

Blue Line or Laser Level 

 

B.

 

Installation: 

 
a)

 

Locate center of bottom hole placement of the first WallRack 

b)

 

Snap a line with the Blue Line or Laser and make a mark with pencil at 

approximately 60” from the floor to the first mounting hole position

 

c)

 

Hold rack straight and center hole over mark position, the bottom hole and 

mark the upper hole at 12” center to center, which would be the 1st 

hole 

down from the top 

d)

 

Remove rack and drill approximately 2-

1/2” deep into concrete with 1/2” x 4” 

 

Drill Bit on center 

e)

 

Squirt in some Concrete Adhesive in both holes 

f)

 

Insert the 

(2) Lag Shields #17504 

into the holes and tap flush with the hammer 

 

Отзывы: