Riser Blocks & Door
Braces Installion
ALWAYS OBSERVE POSTED SAFETY GUIDELINES
WHEN ASSEMBLING THIS PRODUCT. ALWAYS WEAR SAFETY GLASSES
{Left} Riser Block
Assembly Dwg
#11065
Riser Block Installation
- Complete
Assembly of Lower- Tier Lockers,
including final squaring and adjusting.
Lockers must be level.
Pre-assemble 3/8-16 x 2 1/2" Flanged
Hex Bolt & 3/8" Flange Nut included in
Hardware Kits D & E into front hole of
each Riser Block (Left, Right & Center).
The bolt head fits into Counter-Sunk
location on the underside of the block.
Place Right Riser Block on front-right
corner End Panel. The ridge on the
underside of the block rests against the
matching ridge on the End Panel. Refer
to View-B on Drawing #10074 (attached)
for placement.
Note - Blue dimension
lines of drawing will show proper
placement.
Repeat with remaining right
and left riser blocks.
Note - There will be a slight gap
between the block & edge of Top Panel
when positioned correctly
.
{Right} Riser
Block Assembly
Dwg #11067
Place Center Block(s) with pre-
assembled bolt on the horizontal frame.
Follow blue dimensional hole pattern
from Drawing #10074
.
Note - There will
be a slight gap between the sides of the
block and the Top Panels
.
{Center} Riser
Block Assembly
Part #11066
This Face is
towards End
Panel
This Face is
towards End
Panel
This Face is
towards the
Front of Locker
ProPark Series {Upper} Tier Installation Guide
Page 8 of 13