Copyright © 2012 CyberPower Systems, Inc.
Startup Procedure
12
countdown, the green light turns on and the On-grid Solar Power Generating System begins to send power to the grid.
The display returns to show the power being produced and total kWh produced to date.
IMPORTANT:
The default voltage, frequency and reconnect delay values are programmed into the unit at time of shipment from the factory. No changes to
these settings can be made in the field by the user. Only authorized personnel with utility permission may change these settings.