INSTALLATION REQUIREMENTS
PTO SELECTION
PTO ROTATION:
The rotation direction of a PTO is defined
while looking at the output shaft of the
PTO.
PUMP ROTATION:
The rotation direction of a pump is
defined while looking at the input shaft of the
pump.
EXAMPLE:
A PTO with an output shaft that rotates
CW (clockwise) requires a CCW (counter
clock wise) pump.
When ordering your PTO, be sure to
know the rotation direction of your pump, this
will aid your PTO selection.
It is imperative that the rotation direction of
the Load King supplied pump match the PTO
output shaft rotation direction. Either CW or
CCW rotation pumps are available form Load
King .If the pump supplied with your crane is
the wrong rotation direction, contact Load
King customer service.
Do not attempt to rotate the pump in the
wrong direction. Pump failure will result.
The Load King supplied pump has an SAE - B
2-Bolt mounting flange and a 7/8"
(22.225mm) x 13 spline x 1.62in (41 mm) long
splined input shaft. Specify the PTO with this
output mounting provision.
Before installing the PTO, test fit the pump
into the PTO output mounting flange to verify
that the pump housing seats on the PTO
mount housing before the pump shaft bottoms
in the PTO output shaft. Failure to check for
adequate pump shaft end clearance may
damage both pump and PTO.
The PTO manufacturer will supply installa
tion instruction specific to the PTO model
being installed. Follow these instructions and
direct any installation questions to the PTO
manufacturer's customer service department.
Page 2 -
6
CONTACT WITH A ROTATING
DRIVELINE COMPONENT WILL CAUSE
SERIOUS INJURY OR DEATH
KEEP CLEAR OF ROTATING DRIVE
SHAFT
NEVER WORK ON AN INSTALLED
POWER TAKE-OFF WITH THE
ENGINE RUNNING
Note: Keep the protective covers
on the
pump inlet and outlets until
the hoses are
ready to be installed to
keep dirt out!
Содержание LOAD KING 25-92
Страница 1: ...INSTALLATION MANUAL LOAD KING 25 92 MARCH 16 2020...
Страница 2: ...This page left intentionally blank...
Страница 4: ...This page left intentionally blank...
Страница 7: ...This page left intentionally blank...
Страница 21: ...Pages 2 11...
Страница 24: ......
Страница 64: ...Load King Operation Manual SECTION 7...
Страница 91: ...Load King Operation Manual GREER INSIGHT OPERATION MANUAL...
Страница 124: ......
Страница 126: ......
Страница 133: ...This page left intentionally blank...
Страница 135: ...DWG NO B SHEET 2 OF 2 SCALE NONE REV SIZE D 35 TON...
Страница 147: ...SIZE 2 REV 1 D 3 A C SCALE 1 1 SHEET 2 OF 2 A B DWG NO 5 C 2 D D 7 8 B 3 8 6 7 5 4 4 6 1 E...
Страница 149: ...AL TANK SHOWN R A A B B C C D D E E F F G G H H 8 8 7 7 6 6 5 5 4 4 3 3 2 2 1 1 SHEET 2 OF 2 SCALE 1 8 REV DWG NO E SIZE...
Страница 153: ...DWG NO B SHEET 2 OF 4 SCALE 1 2 REV SIZE F...
Страница 154: ...DWG NO B SHEET 3 OF 4 SCALE 1 2 REV SIZE F...
Страница 155: ...DWG NO B SHEET 4 OF 4 SCALE 1 2 REV SIZE F...
Страница 157: ...DWG NO B SHEET 2 OF 4 SCALE 1 2 REV SIZE F...
Страница 158: ...DWG NO B SHEET 3 OF 4 SCALE 1 2 REV SIZE F...
Страница 159: ...DWG NO B SHEET 4 OF 4 SCALE 1 2 REV SIZE F...
Страница 162: ...DWG NO B SHEET 2 OF 3 SCALE REV SIZE A...
Страница 163: ...DWG NO B SHEET 3 OF 3 SCALE REV SIZE A...
Страница 165: ...C A 1 2 SHEET 2 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Страница 166: ...C A 1 2 SHEET 3 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Страница 167: ...C A 1 2 SHEET 4 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Страница 168: ...C A 1 2 SHEET 5 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Страница 169: ...C A 1 2 SHEET 6 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Страница 170: ...C A 1 2 SHEET 7 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...
Страница 171: ...C A 1 2 SHEET 8 OF 8 SCALE REV C SIZE DWG NO A B B C D 4 D 2 3 4 3 1 B...