background image

 

MN6B Installation Diargram 

              

                  

 

Installation Notes: 

Orient the MN6B junction box so the SO-239 faces toward the 

center of the antenna. Connect the two feed harnesses in phase (red leads on same 
side). Position the junction box so any slack in the two feed cables is equal in both 
directions. After securing the box with a worm clamp, disconnect the harness from the 
17/12-meter element (it will be reconnected in Step-9 after the 6-meter driven-element 
brackets are placed in position).  
   

 
Step-9.  Install the Six-Meter Driven Element: 

The six-meter driven element is 

installed “piggyback” in parallel with the 

17/12-meter driven-element

. Use the parts listed 

below: 
 
[  ] 

Element tube, 7/16" OD x 48", (20-MA6B-DD). 

[  ] 

Element tube, 3/8” OD x 9"  (20-MA6B-DE). 

[  ] 

Element mounting bracket, supports driven element

 

[  ] 

Insulating plate, supports 7/16” OD element tube 

[  ] 

90-degree bracket, supports insulating plates 

 

[  ] 

# 8 Lock washer 

[  ] 

8-32 Nut 

[  ] 

1/2" x 8-32 Screw 

[  ] 

3/4” x 8-32 Screw 

[  ] 

3/8” Plastic end cap 

[  ]  

7/16" Worm clamp  

 

 

Six-Meter Driven-Element Assembly Diagram 

 

End Cap

 Worm Clamp

Insulating 

Plate

Worm Clamp

(Existing Part)

90-Degree Bracket

8-32 x 1/2" (2) 

8-32 x 3/4 (2)

Existing #8

Hardware

Element Mounting

Bracket 

Tube DD

Harness

Coax

Insert 4"

Tube DE

8-32 x 3/4 (2)

8-32 x 1/2" (2) 

 Worm Clamp End Cap

Insulating

Plate

Worm Clamp

(Existing Part)

Tube DD

Tube DE

 

 
 
 

Содержание MA6B

Страница 1: ......

Страница 2: ...d fall and hit power lines where people or animals could accidentally come into physical contact with the elements or where humans could be exposed to high intensity RF fields See the ARRL Handbook or...

Страница 3: ...g Bracket 6M driven element 2 205560 1 Insulating plate 6M driven element 2 193 853 90 degree mounting bracket for insulating plate 1 738 1213 Reflector insulating plate x 2 1 2 x 3 1 2 1 735 1109 L m...

Страница 4: ...lock washer 4 5 16 18 Hex nut 2 1 1 2 Plastic end cap for boom Boom Assembly Stages Boom Assembly Boom to Mast Clamp Assembly 57 Reflector End Driven Element End 60 1 1 2 Worm Clamp 4 1 1 2 OD x 48 1...

Страница 5: ...x 10 4 Worm clamp 7 8 to 1 2 Worm clamp 1 to 1 1 4 2 8 32 x 1 3 4 Screw 2 8 Lock washer 2 8 32 Nut 2 7 8 Plastic end cap 20 15 10 Driven Element Assembly EA EA EB EB EC EC MT1 MT1 7 8 1 worm clamp 2 E...

Страница 6: ...mp 7 8 to 1 Worm Clamp Insulator 8 32 x 1 1 2 Screw Insert 5 Insert 5 Installation Notes Follow the same procedure as Step 4 but insert EB tubes 5 inches into ED tubes for this element Step 4 Assemble...

Страница 7: ...orm clamp 7 8 to 1 2 Worm clamp 1 to 1 1 4 2 7 8 Plastic end cap 17 12 Meter Reflector Assembly Installation Notes Double check all work so far against the assembly diagrams before continuing Step 6 I...

Страница 8: ...leted antenna is installed it will be flipped over and the drain holes will face the ground Refer to the Element Mounting Diagram below for details Element Mounting Diagram Driven Element 1 4 20 Hex N...

Страница 9: ...crew X Hat Installation Detail 8 32 x 2 Screw Half washer X Hat rod 41 Element Bracket Element EB 8 Lock Washer 8 32 Nut Trap X Hat Installation Notes Each X hat rod is secured to its element as shown...

Страница 10: ...X41 X41 X41 20 15 10 DE 17 12 DE 20 15 10 REF 17 12 REF MT1 MT1 MT2 MT2 MT3 MT3 MT2 MT2 Step 8 Install the Feedline Junction Box MN6B using the parts listed below 1 MN6B feed network with coax cables...

Страница 11: ...alled piggyback in parallel with the 17 12 meter driven element Use the parts listed below 2 Element tube 7 16 OD x 48 20 MA6B DD 2 Element tube 3 8 OD x 9 20 MA6B DE 2 Element mounting bracket suppor...

Страница 12: ...r Plate x 2 1 2 x 3 1 2 1 L bracket attaches insulator plate to U bolt assembly 1 2 3 4 U bolt assembly with tube clamp and 20 hardware 2 X hat Half washer 2 3 8 Plastic end cap 4 8 Lock washer 4 8 32...

Страница 13: ...to install the boot In that event wrap the connector with self adhering rubber tape Coax Seal or Performix liquid tape to prevent water incursion Route the coax down the boom to within a few inches of...

Страница 14: ...5 16 x 2 1 8 x 3 1 4 2 U bolt In Case of Trouble The MA6B should exhibit low in band SWR readings If the lowest minimum SWR reading you can measure on any band is over 1 5 1 or if the minimum SWR read...

Страница 15: ...20 dB Gain dBd 3 6 4 7 4 8 4 9 5 3 5 5 Min SWR 1 1 1 1 1 1 1 1 1 15 1 1 Power Rating 1200 W ICAS SSB CW 350W AM FM RTTY Digital Elements 6 2 per band Longest Element 17 1 Boom Length 9 9 Boom Diamete...

Страница 16: ......

Отзывы: