![Curtis Kubota M62 TLB Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/curtis/kubota-m62-tlb/kubota-m62-tlb_installation-and-owners-manual_2699754016.webp)
16 of 37
STEP 10: Tighten all bolts
10.1 Torque all 5/16-18 bolts to 19 ft-lbs. (25.8 N-m) in the
following order:
1) Qty 3: windshield support to side frames.
2) Qty 4: ROPS brackets to side frames.
3) Qty 6: cab floorboards to tractor floor pan.
4) Qty 4: upper rear mounts to ROPS.
5) Qty 7: rear panel to upper rear mounts and sideframes.
6) Qty 12: cowl to side frames.
7) Qty 5: heater duct to cowl, rear panel, sideframe
8) Qty 2: cowl to tractor floor pan
9) Qty 2: tractor fender bolts (1L and 1R)
10) Qty 4: lower rear panel brackets (2L and 2R)
10.2 Torque (3) 1/4-20 bolts from the junction block to the right
side frame to 10 ft-lbs. (13.5 N-m).
10.4 Torque the (2) M12 ROPS bolts and nuts at the
windshield support to 62 ft-lbs. (84 N-m).
10.5 Torque the (2) M12 ROPS bolts and nuts at the top of the
rear panel to 62 ft-lbs. (84 N-m).
10.6 Torque the (4) M14 ROPS bolts for the lower rear panel
brackets to 87 ft-lbs. (118 N-m).
STEP 11: Windshield
11.1 Place the windshield onto the front of the side frames and
secure it with (10) 1/4-20 x 1-1/2” flanged hex bolts and
fender washers outside, and flanged nuts inside. Tighten
until there are no visible gaps between the windshield
rubber and frame (see Figure 11.1, roof hidden for clarity).
Hardware Used
QTY
1/4-20 x 1-1/2 Hex Head Flanged Cap Screw
10
Figure 12.1: Trim Floor Mat to Fit
Figure 11.1: Windshield
1/4
Fender
Washer
10
1/4-20 Flanged Nylon Lock Nut
6
STEP 12: Floor Mat
12.1 Re-install floor mat and trim to fit. Three alignment nubs on each side will have to be cut off where the
three button head bolts secure the side frames to the floor board. The front corners will also need to
be trimmed to fit around the cowl. (See Figure 12.1)
STEP 13: Electrical Harness Install
13.1 Locate the supplied power wire harness. Modify the harness to move the purple wire over to the ring
terminal end of the harness. Connect ring terminal on the red wire to the positive (+) battery terminal.
13.2 Connect ring terminal on the black wire to the negative (-) battery terminal.
13.3 Locate the tractor ignition source on the main harness just inside the battery. The connector is a
female bullet terminal wrapped in blue electrical tape.
13.4 Connect the male bullet terminal on the purple wire on the harness to the tractor ignition source.
13.5 Route the cab connector end of the wire harness under the floor of the tractor to the front of the right
sideframe and connect to the wire extending from the right frame.
13.6 Turn the ignition to on and check to see that the switches illuminate and the fan functions.
13.7 Secure the harness to the tractor using supplied cable ties.
13.8 Replace the battery cover.
INSTALLATION