INSTALLATION INSTRUCTIONS
II1
19 If the UCM is not already lit, push the ON/OFF button
POUIF6$.8IFOUIFXBUFSMFWFMJOUIFUBOLSJTFT
to the correct volume, the heating elements will turn
on automatically. Depending on the incoming water
UFNQFSBUVSFBOEUIFFMFDUSJDBMTQFDJmDBUJPOTUIF
water tank typically requires 20 to 30 minutes to
SFBDIUIFGBDUPSZTFUPQFSBUJOHUFNQFSBUVSF8IFO
the water has heated, “Ready to Brew” should be on
the display.
20
#FGPSFCSFXJOHGPSUIFmSTUUJNFEJTQFOTFP[
ml of hot water through the hot water faucet to help
purge air from the tubing inside the brewer.
21 Brew a cycle of at least 12 oz./350 ml, to purge any
remaining air from the tubing. See
OPERATING
INSTRUCTIONS
. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank.
((&.*/45"--"5*0/*/4536$5*0/4ø
092519C
Содержание GEMSIF10A1000
Страница 31: ...ELECTRICAL SCHEMATICS ES2 GEMSIF10A1000 GEMSIF10B1000 ELECTRICAL SCHEMATIC 022717A GEMSIF10A1000 GEMSIF10B1000...
Страница 32: ...GEMSIF63A1000 ELECTRICAL SCHEMATICS ES3 GEMSIF63A1000 ELECTRICAL SCHEMATIC 022717NC...
Страница 34: ...ELECTRICAL SCHEMATICS ES5 5 5 5 53 4 5 GEMTIF10A1000 GEMTIF10B1000...
Страница 37: ...GEM3IF 30 ELECTRICAL SCHEMATICS ES30 53 4 5...