INSTALLATION INSTRUCTIONS
II8
DECANTER/DISPENSER BREWERS, INSTALLATION INSTRUCTIONS
122717A
18 When the water in the tank rises to the correct level, the
heating elements will turn on automatically. Depending
on the incoming water temperature and the electrical
TQFDJmDBUJPOTUIFXBUFSUBOLUZQJDBMMZSFRVJSFTUP
minutes to reach the factory set operating temperature.
When the water has heated,
Ready to brew
will be
displayed on the LCD screen.
19 Perform a brew cycle of a least 12 ounces to purge
any remaining air from the system. See
OPERATING
INSTRUCTIONS
. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank.