Installation
Leveling
1 Position the brewer on the counter top. Level it left to
right and front to back by turning the bottom of the
legs.
Connecting the Brewer Wiring on Brewers Operated
with a 220 Volt (nominal) power supply.
2 Remove the screws that hold the back cover in place
and remove the cover.
3 Loosen the strain relief on the back of the brewer.
4 On dual voltage units being operated at 220 Volts
disconnect the existing power cable from the terminal
block and remove. Disconnect and cap the jumper
wire between the “C” and “N” terminals on the
terminal block.
5 Feed the 220 Volt power cable into the brewer.
6 Connect the wires on the power cable to the terminal
block inside the brewer.
7 Tighten the strain relief and replace the back cover.
8 Connect the power cable wires to the terminals in
the junction box. See the
ELECTRICAL SCHEMATIC
for the power supply requirements. Keep the power
supply to the brewer off until the water supply line is
connected.
INSTALLATION INSTRUCTIONS
II17
BREWERS, REAR COVER, INSTALLATION INSTRUCTIONS
052119B
WARNING:
Use the leveling legs to level the
brewer only. Do not use them to adjust brewer
height. Do not extend them higher than necessary.
&RQ¿JXUDWLRQ
YDULHV
WARNING:
Turn off power to the junction box at
the circuit breaker panel before connecting the
power cable to the brewer. Lock out and tag the
circuit breaker.
7HUPLQDO
EORFN
6WUDLQ
UHOLHI
%DFN
SDQHO