Important!
Must be installed in a Cabinet.
Installation
Strip wires as shown
on illustration.
Mains
110-240VAC ~50/60Hz
Short press P1/P2 to start testing DIGITAL A/B
Bus: lamps start dimming up and down on the
bus until another short press is performed or
5-minute timer is expired. Meanwhile ‘DIGITAL
A/B’ LED is blinking purple
Strip wires as shown
on illustration.
Mains
110-240VAC ~50/60Hz
Short press P1/P2 to start testing DIGITAL A/B
Bus: lamps start dimming up and down on the
bus until another short press is performed or
5-minute timer is expired. Meanwhile ‘DIGITAL
A/B’ LED is blinking purple
Strip wires as shown
on illustration.
Mains
110-240VAC ~50/60Hz
Short press P1/P2 to start testing DIGITAL A/B
Bus: lamps start dimming up and down on the
bus until another short press is performed or
5-minute timer is expired. Meanwhile ‘DIGITAL
A/B’ LED is blinking purple
1
2
3
Short press P1/P2 to start testing DIGITAL A/B Bus: lamps
start dimming up and down on the bus until another
short press is performed or 5-minute timer is expired.
Meanwhile ‘DIGITAL A/B’ LED is blinking purple