background image

SPA525FR User’s Installation Guide 

 

Packaging and Enclosed Parts 

The following diagram shows all of the included parts for assembly and installation. Please inspect your pack for damaged or missing 

parts. Notify your supplier if any discrepancies occur. 

V-rails (4) 
(2 pc each 
speaker) 
 

Speakers 

C-ring 
Rough-ins 

Fastlock 
Speakers 
Grilles 

Rough-in  
Mounting 
Screws  

Only simple hand tool are required for assembly and 

installation. 

Required tools: #2 Phillips screwdriver, Small Flathead 

slotted screwdriver with a 

1/8” inch blade or smaller, Drywall Hand saw. A saber may 

be requires if you are cutting into plywood. 

 

Painting the Speaker Grille 

 

Tear along the smaller perforated line of the cutout template marked as a paint shield. Push it into the front baffle of the speaker. Paint the 

front.   

  Remove the paint shield after the paint has dried. 

 

Drywall Ceiling Installation

 

 

 

Take the cutout template from   the packaging box and 

  punch out along the larger perforated circle. 

  Place the cutout template against the ceiling and 

  and trace along the inside  circle. Carefully cut out 

  the ceiling material along the circle.  

Trace Template 

Cut Material 

Rev 92020Rev1  06/09 

Содержание SPA525FR

Страница 1: ...mounting kit allows for installation in standard 2 x2 or 2 x4 suspended ceiling tiles The kit also offers support to prevent sagging To comply with UL NFPA90 and NFPA70A an earthquake ring is provided on the speaker for added support and to prevent the unit from falling in the event of seismic disturbances Electrical connection up to 12 gauge wire is made by four screw down 2 pole removable captiv...

Страница 2: ...ead slotted screwdriver with a 1 8 inch blade or smaller Drywall Hand saw A saber may be requires if you are cutting into plywood Painting the Speaker Grille Tear along the smaller perforated line of the cutout template marked as a paint shield Push it into the front baffle of the speaker Paint the front Remove the paint shield after the paint has dried Drywall Ceiling Installation 1 Take the cuto...

Страница 3: ...over Knockout b Remove the knockout s from the top terminal cover depending on the direction from which the conduit s will be entering and or leaving the cover c Insert the conduit s into the knockout opening s and secure the conduit to the cover with the locking nut NOTE Installation in a plenum rated environment Requires plenum rated wire gauge of 14 AWG to 18 AWG d Pull the speaker wires from t...

Страница 4: ...s with the speaker detents Twist clockwise until the tabs lock with the Detent NOTE Grill must be rotated enough to ensure it is locked in place to prevent the grill from loosening Seismic Tab Support Line Suspended Ceiling Installation 1 Remove the ceiling tile where the speaker is to be installed 2 Use the cutout template to trace the hole on the tile then cut out the hole see step 1 on page 3 3...

Отзывы: