background image

SPA525FR User’s Installation Guide 

 

The side terminal cover, as shown in step 3f, must first 

 be removed before wiring the speaker. 

Loosen the single top screw of the side terminal cover 

and pull the side terminal cover straight out. 

See the illustration below. 

     

 

 

a)

 

Remove the top terminal cover (see illustration 

 in step 3f) by loosening (do not remove) both top  

 screws, sliding the top terminal cover away from the 

Screws, and removing the cover, as shown here

 

 

Loosen  
Screw 

Side 
Terminal 
cover 

Loosen two 
Screws 

Top Terminal 
Cover 

Knockout 

 b)

 

Remove the knockout (s) from the top terminal 

 cover depending on the direction from which the  

 conduit (s) will be entering and/or leaving the 

 cover. 

 c)

 

Insert the conduit (s) into the knockout opening (s) 

 and secure the conduit to the cover with the locking 

 nut. 

 NOTE

Installation in a plenum-rated environment 

 Requires plenum rated wire gauge of 14 AWG to 

 18 AWG. 

  d)

 

Pull the speaker wires from the conduit, strip 0.2”  

 (5 mm) from the wire ends (do not tin the wires), and 

 secure the wires into the 4 screw z-pole removable 

 captive connector. 

 

 

To connect speakers in parallel, see the wiring  

 diagram below. 

Z-Pole Captive 
Screw Connector 

 e)

 

Bring the speaker up to the bottom of the hole in the  

 ceiling. 

RPA Rev 92020Rev2  04/11 

Содержание SPA525FR

Страница 1: ...mounting kit allows for installation in standard 2 x2 or 2 x4 suspended ceiling tiles The kit also offers support to prevent sagging To comply with UL NFPA90 and NFPA70A an earthquake ring is provided on the speaker for added support and to prevent the unit from falling in the event of seismic disturbances Electrical connection up to 12 gauge wire is made by four screw down 2 pole removable captiv...

Страница 2: ...ead slotted screwdriver with a 1 8 inch blade or smaller Drywall Hand saw A saber may be requires if you are cutting into plywood Painting the Speaker Grille Tear along the smaller perforated line of the cutout template marked as a paint shield Push it into the front baffle of the speaker Paint the front Remove the paint shield after the paint has dried Drywall Ceiling Installation 1 Take the cuto...

Страница 3: ...over Knockout b Remove the knockout s from the top terminal cover depending on the direction from which the conduit s will be entering and or leaving the cover c Insert the conduit s into the knockout opening s and secure the conduit to the cover with the locking nut NOTE Installation in a plenum rated environment Requires plenum rated wire gauge of 14 AWG to 18 AWG d Pull the speaker wires from t...

Страница 4: ...s with the speaker detents Twist clockwise until the tabs lock with the Detent NOTE Grill must be rotated enough to ensure it is locked in place to prevent the grill from loosening Seismic Tab Support Line Suspended Ceiling Installation 1 Remove the ceiling tile where the speaker is to be installed 2 Use the cutout template to trace the hole on the tile then cut out the hole see step 1 on page 3 3...

Отзывы: