SPA525FR User’s Installation Guide
2
The side terminal cover, as shown in step 3f, must first
be removed before wiring the speaker.
Loosen the single top screw of the side terminal cover
and pull the side terminal cover straight out.
See the illustration below.
3
a)
Remove the top terminal cover (see illustration
in step 3f) by loosening (do not remove) both top
screws, sliding the top terminal cover away from the
Screws, and removing the cover, as shown here
.
Loosen
Screw
Side
Terminal
cover
Loosen two
Screws
Top Terminal
Cover
Knockout
b)
Remove the knockout (s) from the top terminal
cover depending on the direction from which the
conduit (s) will be entering and/or leaving the
cover.
c)
Insert the conduit (s) into the knockout opening (s)
and secure the conduit to the cover with the locking
nut.
NOTE
:
Installation in a plenum-rated environment
Requires plenum rated wire gauge of 14 AWG to
18 AWG.
d)
Pull the speaker wires from the conduit, strip 0.2”
(5 mm) from the wire ends (do not tin the wires), and
secure the wires into the 4 screw z-pole removable
captive connector.
To connect speakers in parallel, see the wiring
diagram below.
Z-Pole Captive
Screw Connector
e)
Bring the speaker up to the bottom of the hole in the
ceiling.
RPA Rev 92020Rev2 04/11