32
Appendix...
GB
IE
DOV720AR Double oven
Installation Method 1
560
21
547
718
594
41
600
03
Support rail [03]
570 min
720 min
703
20
15
A
650
•
Fix the two support rails [03] using 8x screws [10] provided, ensuring that
they are level with the base of the adjoining end panel, see Fig 1.
•
Fix the remaining two support rails [04] using 8 screws [09] provided to the
side of the oven,ensuring they are level with the base of the oven.
•
Prepare two uprights (A) (not supplied) from MFC/MDF material,
dimensions need to be W:30-50mm, L:650mm, D:18mm
•
Connect to mains power supply ensuring the cable is not bent (see
electrical connection section)
•
Place the oven on the metal support rails [03] by lifting the appliance with
the handle inserts located on the side of the oven and position in place.
(see Fixing double oven section, Fig 4)
•
Secure the oven in place (see Fig 5)
Fig. 1
Note
•
The panels of the adjacent cabinets must be made of heart-resistant
material. In particular the adhesive that bonds the plastic laminate to
the furniture must be able to withstand temperatures of not less than
150°C to avoid delamination. The appliance must be housed in
heat-resistant cabinets.
Содержание DOV720AR
Страница 38: ...Notes...
Страница 39: ...Notes...
Страница 40: ...GB IE GAA Ltd 1301 1303 1Lu Plaza 2 Wing Yip St Kwun Tong Kowloon Hong Kong...