background image

Exploded View & Hardware Parts

EXPLODED VIEW

HARDWARE LIST

1. Lid handle                x1pc
2. Lid air vent               x1pc              
3. Lid                            x1pc
4. Cooking grid             x1pc
5. Charcoal grid            x1pc
6. Fire bowl                   x1pc
7. Lid hinge                   x3pc
8. Bottom air vent          x1pc
9. Ash tray                     x1pc
10. Leg                          x3pc

1

J

2

3

4

E

H

G

F

I

5

6

7

D

8

9

10

A

B

C

A.  Handle Screw 

2 pcs

B.  Vent Screw 

2 pcs

C.  Leg Screw 

3 pcs

D.  Hinge Screw 

6 pcs

E.  Handle Washer 

2 pcs

F. Leg Washer 

3 pcs

G. Hinge Nut 

6 pcs

H. Handle Nut 

2 pcs

I. Vent Nut 

2 pcs

J. Soft Handle Washer 

2 pcs

ASSEMBLY STEPS

Step 1:

Put the legs (10) through hole of  
ash tray (9) and attach to the  
firebowl (6). Finger tighten to hold 
them together one by one. Tighten 
the screws using a screwdriver.  
Do not twist leg too tighten. 

Step 2:

1.  Install the bottom air vent (8)  

to fire bowl (6).

2.  Attach lid hinges (7) to the  

firebowl (6). Finger tighten to 
hold them together one by 
one. Tighten the screws  
using a screwdriver.

Step 3:

1.  Attach the lid handle (1) to the lid (3).
2.  Attach the lid air vent (2) to the lid (3).

Step 4:

Place charcoal grid (5) onto firebowl (6).  
Place cooking grid (4) on firebowl (6).

PRE-ASSEMBLY CHECK LIST

1. To assure fast and easy assembly, follow the instructions below in their proper sequence.
2. Check all parts carefully and compare them to the parts list.
3. Report any missing parts to the company from with you purchased the product.
NOTE:  For some models, Part C Leg Screw and Part F Leg Washer may be located in the Leg.  For 
some pre-assembled models, Steps 2 and 3 may have already been completed.
STOP! if you experience any missing or broken parts or have any questions regarding assembly, 
please call our Customer Service team at 1-866-994-6390.

Отзывы: