•
Remove the 3 screws shown (left) and set aside for reassembly.
•
Install the LiDAR onto the RVC (right) using the four M3 screws provided
with the LiDAR. Hardware: 4X – HW952
•
Reinstall the intake/blower portion of the assembly using the three screws
that were previously removed (left). Install the mounting plate to SF380 using
the five screws that were bagged and tagged with SF385 (right).
6
SF973-INST